DGS-6600 Layer 3 Chassis Ethernet Managed Switch Hardware Installation Guide
40
Simple Installation Steps
1. Before instillation of the cabinet, please make sure that there is enough space, ensure that the front and rear
doors can be fully opened and that there is enough space to carry out any necessary maintenance after
installation.
2. After verifying the installation location is appropriate, securely mount and fasten the 19” cabinet in the
planned location.
3. Fit the appropriate chute and cables.
4. Fit the appropriate accessories to the cabinet.
Mounting the DGS-6600 Series Switch into the Cabinet
Cabinet Mounting Precautions
Please verify that the front and rear brackets of the cabinet are in the right locations before mounting the DGS-6600 Switch
into the cabinet. If the front bracket is installed too far to the front of the cabinet, it may make it impossible to close the front
door when the network cables and patch leads are connected. At least 10cm of space should be reserved between the front
panel of the equipment and the front of the cabinet after installation to ensure proper closure of the front door.
Before installing the Switch, please verify the following:
• The cabinet has been properly fastened.
• The various modules in the frame have been installed.
• Ensure that there are no obstacles in the frame or the surrounding area when installing the Switch.
Simple Installation Steps
1. The use of a tray or slide rail to assist in installing the chassis to the rack is recommended.
2. With a person on each side of the Switch, move the Switch to the appropriate position in the rack.
3. With one person supporting the Switch, the other should fasten the screws into all the available bracket
holes. The Switch should be stable, secure and steady after it has been installed in the cabinet.