1. Verify if the system power is off.
2. Place the terminal lug ring of the grounding
cable on top of the ground-screw opening,
insert the grounding screw into it and
tighten the screw with a screwdriver.
3. Attach the terminal lug ring at the other
end of the grounding cable to an
appropriate grounding stud or bolt on rack
where the switch is installed.
4. Verify if the connections at the ground
connector on the switch and the rack are
securely attached.
Step 3 – Plugging in the
AC Power Adapter
You can now connect the AC power adapter into the power
connector of the DGS-1210-10P/FL and to an electrical
outlet. The lighted up power LED indicates a successful
power up.
Power Failure
As a precaution, the switch should be unplugged in
case of power failure. When power is resumed, plug the
switch back in.
3
Summary of Contents for DGS-1210-10P/FL
Page 12: ...PУCCКИЙ 12 ...