www.theaquariumsolution.com
•
Initial calibration:
On first use, the app will prompt to calibrate the pH probe, the
Tank
Water
pump and the
KH Solution
pump. Follow the on-screen calibration instructions
carefully. Please note this stage of the setup must be done accurately as failure to do
so will cause inaccurate results. If the initial prompt does not automatically appear go to
settings, select guide and follow the steps shown in the app.
•
Once this initial calibration procedure is complete it is also possible to calibrate the
Reagent
pump. This is not essential but can achieve a greater accuracy in testing to
perform this go to the settings page select ‘
Maintain
’ and then ‘
Calibration
’.
•
Insert the stirring bead into the glass beaker and put the beaker in place in the
KH Manager. It is important that the drain tube is positioned so that the end is touching
the bottom of the beaker and that the water supply tube is located over the beaker.
Re-attach the front cover plate and insert the probe. The pH probe will be held close to
the front of the beaker and should be positioned so the tip sits just above the height of
the stirring bead.
•
In the
Kamoer Remote
app open the settings menu, go to ‘
Maintain
’ and then select
‘
Running Pumps
’, this allows you to run each pump head to confirm there is no air in the
tubing. It is recommended to run the
Tank Water
pump (‘Saltwater Pump’) and
Reagent
pump to check that they are correctly dropping into the beaker and all air is purged.
•
The magnetic stirrer (‘Stirring Pump’) is factory set at 50% power. If when running, the
stirring bead jumps and does not spin smoothly this setting should be reduced.
•
Return to the main settings page, choose ‘
Test
’ from the bottom of the screen and select
the icon in the top right, this will allow you to set the number of times that the beaker
will be flushed with tank water before each test, it is recommended to set this between
3 and 4 times.
•
Initial test:
Return to the ‘
Manual
’ test page and press ‘
Start’
, this will initiate a one
off manual test to confirm that the KH manager is operating correctly. It is highly
recommended after any calibration and before setting the device for automatic testing
to perform a manual test.
•
The KH Manager is now ready to program for automatic monitoring and dosing.
For detailed instructions on this and tips for use please view the KH Manager product
page on our website
www.theaquariumsolution.com
or scan the QR code below.
Visit our website for tips
and instructions for use
EN
Summary of Contents for KHManager
Page 2: ...Q U I C K S T A R T G U I D E...
Page 15: ...www theaquariumsolution com Notes...
Page 16: ......