UM-CV-751-MRK-Q221V1 www.austin-hughes.com
P.4
■
Fix the Multi-display console drawer into the rack.
Complete the installation
Step
3
■
The left and right rear mounting brackets are
attached to the Multi-display console drawer.
Step
1
< 1.3 > Installation - How to install Installation Slides
Step
2
■
Measure the depth of the front and rear mounting rails.
■
Align each rear mounting bracket to a suitable length.
■
Mounting distance : 550 - 790 mm
M6 screw, cage nut & cup washer x 8 are provided.
Installation