background image

Copyright ©  2017 Cyber Power Systems, Inc.

 

HARDWARE INSTALLATION

 

HARDWARE INSTALLATION 

These  versatile  EBM  can  be  mounted  in  a  rackmount  or  vertical  tower 
orientation.  This  versatility  is  especially  important  to  growing 
organizations  with  changing  needs  that  value  having  the  option  to 
position a EBM on a floor or in a  rackmount system. Please follow the 
instructions below for the respective mounting methods.

 

SAFETY PRECAUTIONS

 

CAUTION!   

To  prevent  the  risk  of  fire  or  electric  shock,  only  use  the 

supplied hardware to attach the mounting brackets.

 

RACKMOUNT INSTALLATION 

Step 1: Remove the dust covers 

Remove the dust covers *10pcs from the screw holes. 

Step 2: Rackmount ears & hanging brackets installation 

Attach two rackmount ears to the EBM using the provided M5X7L*8pcs 
screws and tighten two hanging brackets with the M5X6L*6pcs screws. 

Step 3: Rackmount rail Installation 

The  rails  adjust  to  mount  in  48-cm  (19-inch)  panel  racks  from  52  to 
91.5cm (20.5 to 36 inches) deep. Select the proper holes in the rack for 
positioning the EBM in the rack. The EBM takes up position 1 through 9. 

Position the guide screws on the rails into the rear rack square holes to 
temporarily support the rails in place. Tighten the front rail screws on the 
rack. 

Summary of Contents for BPE240V30ART3U

Page 1: ...User s Manual EXTENDED BATTERY MODULE EBM BPE240V30ART3U BPE240V50ART3U Cyber Power Systems Inc www cyberpower com K01 0000209 02...

Page 2: ...with a 240VDC external connection Additional parallel connected Battery modules provide the UPS for a longer extended runtime operation Battery module User s manual Register card Rackmount left rail R...

Page 3: ...attach the mounting brackets RACKMOUNT INSTALLATION Step 1 Remove the dust covers Remove the dust covers 10pcs from the screw holes Step 2 Rackmount ears hanging brackets installation Attach two rackm...

Page 4: ...of the rack with two M5X6L screws and two plastic washers Step 5 Place and secure the UPS on the rails Slide the hanging brackets on the UPS into the rails mounted in the rack with the front of the un...

Page 5: ...ll it for a tower configuration ELECTRICAL INSTALLATION After completing the hardware installation of the UPS you are now ready to plug in the UPS and connect your equipment SAFETY PRECAUTIONS CAUTION...

Page 6: ...is input connector to daisy chain the next Battery module Remove the connector cover for access 6 Output Cable Use this output cable to connect the Battery module to the Power module or to the next Ba...

Page 7: ...two screws to remove the battery cable retention bracket of the 1st battery module Step 3 Use the output cable of the 2nd Battery module to connect the 2nd Battery module to the 1st Battery module St...

Page 8: ...s to scroll to the EBP Number option 5 Press the ENTER button to select the EBP Number submenu The first configuration number will be displayed on the second column of LCD display 6 Press the and butt...

Page 9: ...erminals Replacement Batteries Please refer to the front side of the Battery module for the model number of the correct replacement batteries For battery procurement log onto www CPSww com or contact...

Page 10: ...45 Sealed Maintenance Free Yes Hot Swappable Yes Built in Charger Yes Environment Operating Temperature 32 to 104 0 to 40 Operating Relative Humidity 0 to 90 Non Condensing Safety Conformance Approval...

Reviews: