8
Multiple Batteries Connection – in Parallel
Connect multiple batteries in parallel can increase total battery capacity but still keep terminal voltage
as single battery voltage.
Step 2
Connect the Product to Utility
Connect the product to a wall outlet. Charging the battery for at least 8 hours is recommended to
ensure that the battery’s maximum charge capacity is achieved. To recharge the battery and maintain
optimal battery charge, simply leave the unit plugged into a wall outlet at all times. The battery can be
charged whether the unit is turned on or off.
DO NOT
connect Neutral of the Power Distribution Box to (a) the OUTPUT Neutral of this product, or (b)
the INPUT Neutral of connected equipment. Otherwise, reversed polarity will damage the product and
connected equipment.
Step 4
Connect the Load
Connect the load to the unit’s outlet. Make sure that the total loads of your appliances are below 80% of
the unit’s rated capacity.
Summary of Contents for CPD1200EILCD
Page 1: ...Power Inverter Diamond Series CPD1200EILCD User s Manual ...
Page 2: ...2 ...
Page 17: ......