background image

 

Vault Building Maintenance Manual 

Page 7 of 8 

After tension adjustment pin is locked in place for all spring hinges at maximum 

tension, test door closing force. If force is more than required, unwind the tension 

adjustment pin 90º, one spring hinge at a time until desired force is reached. 

Adjusting the door sweep 

To adjust the door sweep, loosen all visible screws, adjust it to the desired position 

then replace the screws. 

Adjusting the door 

Spring tension controls the door. If you are having trouble with the door opening 

and closing, try adjusting the spring tension using the steps listed on page 3. 

HANDICAP ACCESSIBILITY 

All CXT restroom facilities are designed with handicap accessible features and meet all 

current ADA standards. The toilet riser or water closet may seem a little too high or the 

door may close a little slowly. These features were placed into your building to meet ADA 

standards. Replacing the riser or water closet with one that is lower will not meet ADA 

requirements. Also increasing the door tension or choosing inexpensive replacement 

signs could move your building out of compliance with the ADA guidelines. Before you 

change any part, please check with CXT to ensure your changes will meet ADA 

requirements. If you have any accessibility questions regarding your buildings, please 

contact us at 1-800-663-5789. 

 

 

10 

 

11 

 

Summary of Contents for Cascadian

Page 1: ...800 696 5766 VAULT BUILDING MAINTENANCE MANUAL...

Page 2: ...663 5789 Spokane WA 99216 Phone 509 921 8766 Email sales lbfoster com www cxtinc com TABLE OF CONTENTS START UP PROCEDURES 3 FREQUENTLY ASKED QUESTIONS 4 FACILITY MAINTENANCE 5 HANDICAP ACCESSIBILITY...

Page 3: ...ns or concerns there are a few things you can do to help us serve you better Please read this manual It contains instructions to help you use and maintain your facility properly Save time and money Re...

Page 4: ...e the edge of the trowel to cut in groves of barnwood or straightedge Finish by re staining with appropriate color and sealing with graffiti sealer The CXT Touch up Kit is ideal for this purpose and i...

Page 5: ...detailed instructions FACILITY MAINTENANCE Touch up paint CXT offers a paint Touch up Kit that includes all the products you will need to touch up interior and exterior chips and includes supplies to...

Page 6: ...rill or pull out the rest of the anchor Clean out the existing holes or make new ones measuring in diameter Connect new signs using concrete sinkers Adjusting the spring tension on the doors First det...

Page 7: ...ng the steps listed on page 3 HANDICAP ACCESSIBILITY All CXT restroom facilities are designed with handicap accessible features and meet all current ADA standards The toilet riser or water closet may...

Page 8: ...e representatives are available from 7 30AM to 4 30PM Pacific Standard Time Monday thru Friday 3808 N Sullivan Road Building 7 Spokane WA 99216 509 921 8766 Email sales lbfoster com www cxtinc com or...

Reviews: