CUSHCRAFT A144-20T Assembly And Installation Manual Download Page 4

A144-20T

231

28

26

BOOM

41

11

41

11

26

28

231

1-7/8"

(4.8 cm)

FRONT

53

V2

26

120

23

41

11

941

41

11

921

941

41

9

11

41

53

941

41

941

41

11

921

921

11

41

26

120

23

41

11

53

H2

ED

9

5"

(12.7 cm)

1-7/8"

(4.8 cm)

5"

(12.7 cm)

251

RT

PT

RR

Reddi-Match

9

010009

SS MACHINE

8-32 x 5/8"

2

SCREW

(1.6 cm)

11

010011

SS

8-32

24

HEX NUT

23

190023

CONNECTOR

2

BRACKET

26

190026

ALUMINUM

7/8"

20

BRACKET

(2.2 cm)

28

190028

ALUMINUM

18

HALF WASHER

41

011941

SS LOCK

#8

26

WASHER

53

050053

PLASTIC

1/2"

4

CAP

 (1.3 cm)

120

010120

SS MACHINE

8-32 x 2"

2

SCREW

(5.1 cm)

231

010231

SS MACHINE

8-32 x 1-3/4"

18

SCREW

(4.4 cm)

251

050251

PLASTIC

3/8"

2

CAP

(1 cm)

921

200921

TUNING

4

STRAP

941

360941

FLAT

#8

4

WASHER

H2/V2

ALUMINUM

1/2" x 39-1/4"

2

TUBE

(1.3 x 99.7 cm)

PT

POLY

3/16" x 4-1/2"

2

TUBE

(.5 x 11.4 cm)

RR

REDDI-MATCH

3/16" x 4"

2

ROD

(.5 x 10.2 cm)

RT

ALUMINUM

3/8" x 6-1/2"

2

TUBE

(.9 x 16.5 cm)

KEY        P/N                     DISPLAY                         DESC                         SIZE                  QTY

5

KEY        P/N                     DISPLAY                         DESC                         SIZE                  QTY

Assemble the two driven element tubes (H2,V2) and con-
nector brackets (23) to the boom at the positions shown in
figure B using the hardware shown in figure C.  Note that the
connectors point toward the center of the boom.  Assemble
the Reddi-Match components RR, PT, RT and 251.  Set
them aside for the moment.  Loosely attach the Reddi-
Match straps (921) to the driven elements (H2,V2)
as shown.  Slide the Reddi-Match assembly
through the Reddi-Match straps and secure
the rod (RR) to the connector.  Use washer
(41)  and nut (11).  Next, slide the poly tube
(PT) to the flattened end of the rod (Figure C-
2).  Set the dimensions shown in figure C and
tighten the hardware.  Note: Reddi-Match
settings are different for H2 and V2.

Two sets of elements are provided with the
antenna.  Each set is mounted 90 degrees to
the other.  Lengths are shown in Table A.
Using Figure B for positioning, attach
the elements using the hardware
shown in Figure D.  Element lengths
within 1/16" ( .16 cm) of the stated
length are acceptable.  Check ele-
ments again to assure that they are in
the correct position and tighten the
hardware.

#2-ELEMENT ASSEMBLY

FIGURE D

Poly tube on Reddi-Match
should be touching
the flared rod end.

Poly Tube

H1, V1

40-5/8" (103 cm)

2

H2, V2

39-1/4" x  1/2"

2

(99.7 x 1.3 cm)

H3, V3

37-3/4" (95.9 cm)

2

H4, V4

36-1/2" (92.7 cm)

2

H5, V5

35-3/8" (89.9 cm)

2

H6, V6

34-3/8" (87.3 cm)

2

H7, V7

33-3/4" (85.7 cm)

2

H8, H9, V8, V9

32-3/4" (83.2 cm)

4

H10, V10

31-1/8" (79.1 cm)

2

TABLE A (Elements)

NOTE: Figure C is rotated 180 degrees for clarity.

FIGURE C

FIGURE

C-2

Summary of Contents for A144-20T

Page 1: ...951452 5 97 C O R P O R A T I O N ASSEMBLY AND INSTALLATION A144 20T 2 METER TWIST YAGI ANTENNA 144 148 MHz Downloaded by RadioAmateur EU ...

Page 2: ... will provide the best service and longest life Often it is desirable to mount several antennas ononemast Tokeeppossibleinteractiontominimum placeyourantennasasfarapartasyoucan TheA144 20Ttransmitsandreceiveshorizontal and vertical polarization Vertical polarization is normally for FM and packet while horizontal polarization is normally for SSB and CW SYSTEM GROUNDING Direct grounding of the anten...

Page 3: ...m white plastic cap 2 326 290326 Danger label 1 401 010401 3 x 1 3 4 7 6 x 4 4 cm stainless steel U bolt 2 2 MASTER PARTS LIST KEY PART DESCRIPTION QUANTITY KEY PART DESCRIPTION QUANTITY 404 010404 3 1 4 x 2 7 16 8 3 x 6 2 cm stainless steel U bolt 2 410 030410 1 2 5 cm stainless steel worm clamp 2 921 200921 Reddi Match clamp 4 941 360941 8 aluminum flat washer 4 BA 1 x 48 2 5 x 122 cm aluminum t...

Page 4: ...rd the center of the boom Assemble the Reddi Match components RR PT RT and 251 Set them aside for the moment Loosely attach the Reddi Match straps 921 to the driven elements H2 V2 as shown Slide the Reddi Match assembly through the Reddi Match straps and secure the rod RR to the connector Use washer 41 and nut 11 Next slide the poly tube PT to the flattened end of the rod Figure C 2 Set the dimens...

Page 5: ... and tighten the worm clamps Push the end caps 61 onto the ends of the boom KEY P N DISPLAY DESC SIZE QTY FIGURE B 6 5 16 16 cm 1 7 16 3 65 cm 12 11 16 32 2 cm 17 13 16 45 2 cm BA BC BA BB BC 410 61 410 61 12 7 16 31 6 cm 1 7 16 3 65 cm BB 11 27 9 cm Make a mark here Make a mark here 5 12 7 cm 20 3 8 51 75 cm 15 1 8 38 42 cm 132 335 3 cm FRONT BACK FIGURE A 15 38 1 cm 16 3 8 41 6 cm FRONT BACK Vie...

Page 6: ...1 010401 SS 3 x 1 3 4 2 U BOLT 7 6 x 4 4 cm 404 010404 SS 3 1 4 x 2 7 16 2 U BOLT 8 3 x 6 2 cm FIGURE E 115 050115 CONN 2 BOOT 116 240116 SILICONE 2 PACKAGE KEY P N DISPLAY DESC SIZE QTY SILICONE GREASE cushcraft 4 FEEDLINE This antenna is designed for use with 50 Ohm coaxial cable termi nated with a PL 259 connector Any length of feedline can be used with your A144 20T The shortest length of cabl...

Page 7: ...clusions or limitations of incidental or consequential damages so the above limitation and exclusion may not apply to you This warranty gives you specific legal rights and you mayalsohaveotherrightswhichvaryfromstatetostate This warrantydoesnotextendtoanyproductswhichhavebeensubjecttomisuse neglect accidentorimproper installation Any repairs or alterations outside of the Cushcraft factory will nul...

Reviews: