CUSHCRAFT A144-11 Assembly And Installation Manual Download Page 4

A144-11

11

010011

SS

8-32

14

HEX NUT

26

190026

ALUMINUM

7/8"

11

BRACKET

(2.2 cm)

28

190028

ALUMINUM

10

HALF WASHER

41

011941

SS LOCK

#8

14

WASHER

53

050053

PLASTIC

1/2"

2

CAP

 (1.3 cm)

79

010079

SS MACHINE

8-32 x 1/2"

2

SCREW

(1.3 cm)

120

010120

SS MACHINE

8-32 x 2"

1

SCREW

(5.1 cm)

125

200125

TUNING

1

STRAP

231

010231

SS MACHINE

8-32 x 1-3/4"

10

SCREW

(4.4 cm)

251

050251

PLASTIC

3/8"

1

CAP

(.9 cm)

CB

CONNECTOR

1

BRACKET

EB

ALUMINUM

1/2 x 38-7/16"

1

TUBE

(1.3 x 97.6 cm)

Slide the four pieces of the Reddi-Match assembly (PT, RR, RT, 251) together (figure B).  Slide the tuning strap (125) onto the driven element (EB)
and secure loosely with screws (79), nuts (11) and lock washers (41).  Press on end caps (53).  Slide the Reddi-Match assembly through the tuning
strap.  Connect the flattened rod end to the screw on the connector bracket (CB) with nut (11) and washer (41).  Attach the entire driven element
assembly shown below to the boom with hardware provided
referring to figure D for the proper location.  Slide the poly tube
(PT) on the Reddi-Match assembly over the rod (RR) up to the
flattened end of that rod (figure B-2).  Adjust to the dimensions
indicated and tighten all connections.  Be sure that the connec-
tor is pointed towards the center of the boom and the Reddi-
Match assembly is parallel to the element above.

Check all element lengths using table A.  The cutting tolerance
on these elements is 

±

1/16" (.16 cm).  The elements are

progressively shorter as you proceed toward the front end of
the boom.  Attach each element to the boom per figure C
referring to figure D for proper location.

KEY        P/N                     DISPLAY                         DESC                         SIZE                  QTY

3

PT

POLY

3/16" x 4-1/2"

1

TUBE

(.5 x 11.4 cm)

RR

REDDI-MATCH

3/16" x 4"

1

ROD

(.5 x 10.2 cm)

RT

ALUMINUM

3/8" x 6-1/2"

1

TUBE

(.9 x 16.5 cm)

KEY        P/N                     DISPLAY                         DESC                         SIZE                  QTY

ELEMENT

LENGTH

KEY

NO.

INCHES

CM

EA

1

40-1/4

102.2

EB

2

38-7/16

97.6

EC

3

36-3/4

93.3

ED

4

36-1/4

92.1

EE

5

35-3/4

90.8

EF

6

35-1/4

89.5

EG

7

34-3/4

88.3

EH

8

34-1/4

87.0

EI

9

33-3/4

85.7

EJ

10

33-1/4

84.4

EK

11

32-3/4

83.2

TABLE A

#2 - ELEMENT ASSEMBLY

#2 - ELEMENT ASSEMBLY

#2 - ELEMENT ASSEMBLY

#2 - ELEMENT ASSEMBLY

#2 - ELEMENT ASSEMBLY

BOOM

ELEMENT

11

41

26

28

231

BOOM

EB

79

11

41

26

53

125

11

41

Reddi-Match

CB

11

41

120

3/4

"

(1.

9 c

m)

(13

.65

cm

)

Cen

tero

f An

tenn

a

53

251

RT

PT

RR

5-3

/8"

Poly Tube

Poly tube on Reddi-Match

should be touching the 

flared rod end.

FIGURE C

FIGURE B-2

FIGURE B

Summary of Contents for A144-11

Page 1: ...A144 11 951427 8 92 ASSEMBLY AND INSTALLATION A144 11 A144 11 A144 11 A144 11 A144 11 2 METER YAGI ANTENNA 144 146 MHz ...

Page 2: ...will provide the best service and longest life Often it is desirable to mount several antennas on one mast To keep possible interaction to minimum place your antennas as far apart as you can Mount the A144 11 with the Reddi Match rods pointing up Keep the mast mount bracket on the opposite side of the boom from the elements This will help to minimize pattern distortion from the mast See page 5 for...

Page 3: ...ainless steel flat washer 4 410 030410 1 2 5 cm stainless steel worm clamp 2 BA 1 x 48 2 5 x 122 cm aluminum tubing slotted both ends 1 BB 7 8 x 50 2 2 x 127 cm aluminum tubing 2 CB Connector bracket 1 EA 40 1 4 102 2 cm element rod 1 EB 38 7 16 97 6 cm element tube drilled in center 1 EC 36 3 4 93 3 cm element rod 1 ED 36 1 4 92 1 cm element rod 1 EE 35 3 4 90 8 cm element rod 1 EF 35 1 4 89 5 cm...

Page 4: ...nd of that rod figure B 2 Adjust to the dimensions indicated and tighten all connections Be sure that the connec tor is pointed towards the center of the boom and the Reddi Match assembly is parallel to the element above Check all element lengths using table A The cutting tolerance on these elements is 1 16 16 cm The elements are progressively shorter as you proceed toward the front end of the boo...

Page 5: ...LAY DESC SIZE QTY SILICONE GREASE cushcraft cushcraft COAT WITH SILICONE GREASE DO NOT coat the center pin or socket cushcraft Mount the antenna to your mast using the mounting plate 70 and the hardware provided per figure E Refer to figure D for the balance point Tighten the U bolts taking care not to crush the boom 3 MAST MOUNT 3 MAST MOUNT 3 MAST MOUNT 3 MAST MOUNT 3 MAST MOUNT KEY P N DISPLAY ...

Page 6: ...om mast FIGURE G 76 193 cm FIGURE I FIGURE H DUAL STACKING KIT A14 VPK HARNESS ONLY A147 SK TheA144 11maybestackedinarraysforincreasedgainandimproved radiation patterns When stacking two A144 11 s use the A147 VPK stacking kit figure H When stacking four antennas use two A147 22 antennas and one A147 SK harness figure I QUAD ARRAY 2 A147 22 A147 SK HARNESS 6 STACKING OPTIONS 6 STACKING OPTIONS 6 S...

Page 7: ...ch antenna is defective then Cushcraft Corporation will at its option repair or replace the antenna at its expense within thirty days of the date the antenna is returned at purchasers expense to Cushcraft or one of its authorized representatives This warranty is in lieu of all other expressed warranties any implied warranty is limited in duration to one year Cushcraft Corporation shall not be liab...

Reviews: