background image

Parts List

Setup Steps Continued

3.  Connect the water line to the water inlet fitting on the rear of the unit. Water volume going to the machine should be consistent. 

Use tubing sized sufficiently to provide a minimum flow rate of two gallons per minute.

4. Connect the unit to electrical outlet with appropriate amperage rating  (refer to schematic for power requirements). 
5. Turn on the circuit running power to unit. The water inlet valve will open, filling the unit. When the boiler has filled,   turn on 

boiler at the thermostat, twisting the knob clockwise.

6. Heating tank will require 50 to 60 minutes to attain operating temperature. Thermostat indicator will light at this time.

2

DESCRIPTION

 1
 2
 3
 4
 5
 6
 7
 8
 9
10
11
12
13
14
15
16
17
18
19
19A
20
21

WC-5602
WC-1800HW
WC-3705HW
WC-1902
WC-1903
WC-1906
WC- 511
WC-5502-01
WC-3914
WC-2966
WC-5386
WC- 922-04
WC- 501
WC-3220
WC-3217
WC- 608-101
WC-5611
WC-2401
WC- 801
WC- 858
WC-3700
WC- 813

INDEX №

LID WITH KNOB
FAUCET, “S” SERIES HOT WATER 1-1/32-14 UNS
KIT, FAUCET S SERIES HOT WATER
SHANK, FAUCET PLAIN W/NUTS
NUT, UNION SHANK WB-10
“C” RING .917 X .760 X .090
THERMOMETER, DIAL RU’S
KIT, PROBE, WATER LEVEL W/HEX FITTING, O-RING, NUT
LABEL, “HOT WATER” (WB-10)
FITTING, WATER INLET WB-10
TUBING ASSEMBLY, WATER INLET
ELEMENT, HEATING 3.5KW 220V W/NUTS & WASHERS
THERMOSTAT, CAPILLARY DPST 277V 30A RU/WB
BEZEL, THERMOSTAT ELECTRIC
KNOB, ELECTRIC THERMOSTAT
CONTROL BOARD, LIQUID LEVEL 120/240VAC
COVER, BOTTOM WB-10
ELBOW, 3/8 NPT X 1/4 FLARE PLATED
VALVE, INLET BRASS .50 GPM 120V 10W 

WB-10-12

VALVE, INLET BRASS .50 GPM 220V 10W 

WB-10-60

KIT, INLET VALVE REPAIR  
FLOW WASHER, .5 GPM .5” S45

PART №

Reviews: