background image

1

Symbols

WARNINGS – To help avoid personal injury

Important Notes/Cautions – from the factory

Sanitation Requirements

Service Manual, Milano Single Head Coffee Brewer

Important Safeguards & Symbols

This equipment is designed for commercial use. Any servicing other than cleaning and routine maintenance should be 

performed by an authorized Wilbur Curtis Company service technician.

•   DO NOT immerse the unit in water or any other liquid
•   To reduce the risk of fire or electric shock, DO NOT open service panels. There are no user serviceable parts inside. 
•   Keep hands and other items away from hot areas of the unit during operation.
•   Never clean with scouring powders or harsh chemicals.

The Curtis Milano Brewer is Factory Pre-Set and Ready to Go… Right from the Carton.

Following are the Factory Settings for your Coffee Brewing System:

 

• Brew Temperature = 200°F 

 

 

• Water Bypass = On for LARGE & MEDIUM Brew Only

 

• Brew Volume = Set to Vessel Requirement. 

• Sleep Mode = Off

System Requirements:

 

• Water Source   20 – 90 PSI (Minimum Flow Rate of 1 GPM)

 

• Electrical: See attached schematic for standard model or visit www.wilburcurtis.com for your model. 

SETUP STEPS

The unit should be level (left to right and front to back), located on a solid counter top.  Connect a water line from the 

water filter to the brewer. 

NOTE: A water filtration system must be used to help maintain trouble-free operation. Air must be purged from the car-

tridge prior to connection to equipment. In areas with extremely hard water, we highly recommend the use of a Curtis 

approved water filter. For our full line of filters, please log on to www.wilburcurtis.com.

1.  A 3/8” NPT x 3/8” Flare elbow has been supplied for water line connection.  Use tubing sized sufficiently to provide a 

minimum of 1.0 GPM.

2.  To hookup the InterLock grinder, Locate the  jack labeled “Class 2 Wiring Only” on brewer and grinder. Connect the two 

with the cable plug.

3.  Connect the unit to an appropriate electrical power circuit.
4.  Turn on the toggle (STANDBY/ON) switch behind the unit. The heating tank will start to fill.  When the water level in 

the tank rises to the correct volume, the heating elements will energize automatically.  With the G4 system there is no 

danger of element burnout   caused by an empty tank.

5.  The heating tank will require 20 to 30 minutes to reach operating temperature (200°F). You will be notified when 

READY-TO-BREW  appears on the control panel LCD screen.

6.  Prior to brewing, dispense 12 ounces of hot water through the hot water faucet.
7.  Brew a cycle of at least 12 ounces, to purge the water lines of any air that may be trapped after filling.

NSF International requires the following water connection:
1. A quick disconnect or additional coiled tubing (at least 2x the depth of the unit) so that the machine can be 

moved for cleaning underneath the unit.

2. This equipment is to be installed with adequate back flow protection to comply with applicable federal, state 

and local codes.

3.  Water pipe connections and fixtures directly connected to a potable water supply shall be sized, installed and 

maintained in accordance with federal, state, and local codes.

W

ilbur

 C

urtis

 C

ompany

, i

nC

.

Models Included

u

 TPC2S

CAUTION: DO NOT 

connect this brewer 

to hot water. The 

inlet valve is not rated for hot 

water.

CAUTION: Please 

use this setup proce

-

dure before attempt

-

ing to use this brewer. Failure 

to follow the instructions can 

result in injury or the voiding of 

the warranty.

IMPORTANT 

Equipment to be 

installed to comply 

with applicable federal, state, 

or local plumbing/electrical 

codes having jurisdiction

.

ISO 9001:2008 REGISTERED

WILBUR CURTIS CO., INC.

6913 West Acco Street

  Montebello, CA 90640-5403

For the latest information go to 

www.wilburcurtis.com

Tel: 800-421-6150

Fax: 323-837-2410

FOR THE LATEST SPECIFICATIONS AND INFORMATION GO TO WWW.WILBURCURTIS.COM

Summary of Contents for TPC2S

Page 1: ...d Class 2 Wiring Only on brewer and grinder Connect the two with the cable plug 3 Connect the unit to an appropriate electrical power circuit 4 Turn on the toggle STANDBY ON switch behind the unit The...

Page 2: ...om right brew button The screen will display wait until is displayed Enter the 4 digit access code the code cor responds to the buttons illustrated below The default code set at the factory is 1 2 3 4...

Page 3: ...3 Programming Control Module Menu Tree The flow chart displays the sequence of menu items that can be accessed through the UCM...

Page 4: ...4 PARTS DIAGRAM 1 2 3 4 5 6 7 8 A B C 9 10 11 12 13 14 15 16 17 18 19 20 23 26 27 28 29 30 31 32 33 34 35 36 37 38 24 25 21 22...

Page 5: ...CTION RIGHT COVER TOP KIT DUMP VALVE RIGHT 120V 14W VALVE BREW DUMP RIGHT 240V 12W TP TPC FITTING SPRAYHEAD VALVE BY PASS W RESISTOR VALVE BY PASS 220V NON ADJUSTABLE RSTR SOLENOID LOCK BREWCONE RIGHT...

Page 6: ...6 ELECTRICAL SCHEMATIC...

Page 7: ...everage Preheating is recommended 1 Place a clean and empty server centered under the brewcone of the Milano brewer 2 Make sure the screen reads READY TO BREW 3 Fill brewcone with the correct measure...

Page 8: ...operate while timer is in the timing mode MINUTE The MINUTE button sets minutes Each time you press the MINUTE button an outline bar will be added Each bar represents 15 minutes starting from bottom t...

Page 9: ...ess timer for 1 hours Press START STOP once Press HOUR button once Press MINUTE button twice 1 2 3 4 5 To interrupt timer press START STOP button again Screen will return to 1 hrs Press START STOP but...

Page 10: ...hanical and plumbing codes 3 Improper voltage Equipment must be installed at the voltage stated on the serial plate supplied with this equipment 4 Improper water supply This includes but is not limite...

Reviews: