background image

2

Your Curtis ADS System is Factory Pre-Set for Optimum Performance.

After connection to water and power; the rear toggle switch must be on. You will hear a beep sound, indicating power is available to the controller.

The control displays

    . Press ON/OFF button and the screen will display

   . After three seconds,

                is displayed.

Water will fill the tank (approximately 2-3 minutes depending on water flow rate). When the proper level is reached

  will appear on the

screen. It takes approximately 20 minutes to reach setpoint temperature of 200

°

F.

Control will display

   when temperature reaches the setpoint (200

°

F). Unit is now ready to brew.

T-PRO 1

CURTIS

CURTIS

CURTIS

FILLING . . .

CURTIS

HEATING . . .

CURTIS

READY TO BREW

ThermoPro

All programming selections are performed with the three center buttons.
The symbols below the buttons are:

      Scroll LEFT

SELECTION or ENTER to save new parameter

Scroll RIGHT

IMPORTANT NOTE:

Reviews: