Installation
Leveling
1 Position the brewer on the countertop. Level it left to
right and front to back by turning the bottom of the
legs.
Connect the Water Supply
2 Flush the water supply line prior to installation to
QVSHFBJSBOEEFCSJTGSPNUIFXBUFSmMUFSBOEUVCJOH
3
$POOFDUUIFXBUFSTVQQMZMJOFUPUIFnBSFmUUJOHPO
the back of the brewer. Leave the water supply valve
closed until the power is connected.
Connect the Brewer Wiring
Brewers With a Power Connector Mounted on the Back
4 Connect a C20 IEC power cord (not supplied)
compatible with the electrical outlet installed in the
GBDJMJUZBOEUIBUNFFUTTQFDJmDBUJPOT
INSTALLATION INSTRUCTIONS
II8
DECANTER/DISPENSER BREWERS, INSTALLATION INSTRUCTIONS
081519C
WARNING:
Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than necessary.
Front
panel
or
Style
varies
Brewers With a Strain Relief Mounted on the Back
5 Remove the front panel.
6 Loosen the strain relief on the back of the brewer.
7 On dual voltage units being operated at 220-240 Volts
(nominal) disconnect the existing power cable from
the terminal block and remove. Disconnect and cap
the jumper wire between the “C” and “N” terminals on
the terminal block.
8 Feed the 220-240 Volt power cable into the brewer.
The brewer may be wired for connection directly to
a junction box or (if local ordinances permit) for use
with a power plug that connects to an electrical outlet
meeting the brewer
SPECIFICATIONS
.
9 Connect the wires on the power cable to the terminal
block inside the brewer.
10 Tighten the strain relief and replace the front panel.
Terminal
block