background image

GEMINI 200R COFFEE BREWING SYSTEM

Read and follow Setup Instructions before attempting to use this brewer. This manual should
cover most questions you may have about the Gemini 200R. However, if you need additional
information, you can call our factory Technical Service Department at (323) 269-8121.
When you encounter index numbers in parentheses, following parts mentioned, they refer to the
index numbers on the parts list, pages 7 to 10.

SETUP INSTRUCTIONS

  1. Carefully unpack shipping carton. Check for any damage.

  2. Attach the four adjustable legs, threading them into tapped holes underneath the brewer.

Level the machine.

  3. Rinse out the brew cone and satellite with water.

  4. Hookup electrical and plumbing to comply with all local building codes.

A . Remove the panel in back of the machine to gain access to the wiring for electrical

hook-up (see fig. 1 to wire power to the brewer).

B. Thread the 3/8" compression fitting into the water inlet valve behind the brewer. Run a

3/8" copper tubing water line with a 3/8" flare nut to this fitting. It is recommended
that a water shut off valve be installed on the incoming water line to the brewer.

IMPORTANT: Brewer must be connected to COLD water line. Water inlet valves are not
rated for hot water.

  5. Remove the top cover (1) by loosening four screws.

  6. Make sure the thermostat (56) is turned OFF (knob turned all the way counterclockwise),

otherwise the heating elements will be damaged if the tank is not filled with water.

  7. Open water supply valve.

  8. Switch power on at the power switch (45) behind the brewer. This will activate the com-

ponents in the brewer. Water will now automatically start filling the heating tank and will
stop once the water level reaches the probe tip (78).

  9. Turn the thermostat ON, by turning knob fully clockwise. Replace top cover.

10. Turn ON the ON/OFF switch (30), located on the front panel.

11. Place Satellite server on warmer deck.

12. Push ON warmer switch (28) to preheat the Satellite server. Before brewing coffee, the

Satellite servers must be preheated for ten minutes.

13. Allow ten minutes for the water in the tank to reach full temperature. After the initial heat

up, temperature recovery is very rapid. You can brew up to two 24-cup cycles before you
must allow time for temperature recovery between brews.

IMPORTANT: Never brew coffee into a cold Satellite. Doing so will result in a lower coffee

     serving temperature.

1

Summary of Contents for GEMINI 200R

Page 1: ...56789012 1234567890123456789012345678901212345678901234567890123456789012123 1234567890123456789012345678901212345678901234567890123456789012123 1234567890123456789012345678901212345678901234567890123...

Page 2: ...on Elbow Legs Adjustable 4 Counter Gem 3 Satellite Server Faucet Guard Faucet 1 1 1 25 1 4 1 1 1 Qty Item Avoid electrical shock the body of this brewer must be securely grounded A GREEN grounding scr...

Page 3: ...led on the incoming water line to the brewer IMPORTANT Brewer must be connected to COLD water line Water inlet valves are not rated for hot water 5 Remove the top cover 1 by loosening four screws 6 Ma...

Page 4: ...2345678901234567890121234567890123 123456789012345678901234567890121234567890123 123456789012345678901234567890121234567890123 123456789012345678901234567890121234567890123 1234567 1234567 1234567 123...

Page 5: ...eaking 3 Remove hot water spout aerator 13 and clean it at least once a week 4 The inside of the heating tank should be de limed at least every six months or more often in areas with especially hard w...

Page 6: ...water condition persists check the opera tion of the liquid level control board Measure voltage at the input terminals T2 T3 of the L L C Your voltmeter should read approximately 115 volts It should a...

Page 7: ...d it s mounting bracket All wire connections to the board should be tight Measure voltage at the input terminals T2 T3 of the L L C board Your voltmeter should read approximately 115 volts It should a...

Page 8: ...e the timer If the timer is working check the coil on the dump valve If there is voltage you should read approximately 115 volts be tween the terminals If there is voltage the coil may be burned Repla...

Page 9: ...Gemini System 200R Illustrated Parts List 7 9...

Page 10: ...Gemini System 200R Illustrated Parts List 8...

Page 11: ...W 120V NUT 8 32 KEP ZINC SPOUT HOT WATER NO SPLASH AERATOR CHROME PLATED FEMALE ADAPTOR AERATOR CHROME PLATED MALE WASHER 1 2 I D INTERNAL BRACKET FAUCET SUPPORT LABEL SWITCH PANEL W O HOT WATER LEG 4...

Page 12: ...IGHT SCREW 6 32 x 7 8 PANHEAD SCREW 8 32x PHILLIPS TRUSS HD SS GUARD SHOCK BOARD LIQUID LEVEL CONTROL WASHER 8 EXTERNAL LOCK THERMOSTAT CAPILARY SPST 277V 22A O RING FITTING SPRAYHEAD FITTING BRASS PR...

Page 13: ...ATER CUT OFF THERMOSTAT WC 508R BLACK 1 1 GEMINI 200R 10 WHITE BROWN WC 817 T4 T3 T2 T1 LIQUID LEVEL CONTROL WC 608 PROBE WC 5502 BLK DUMP VALVE WARMER WC 947 HOT WATER VALVE WHITE BLUE BLACK WC 818 B...

Page 14: ...ONLY NO FAUCET OR LID LID SATELLITE PLASTIC GEM 3 GAUGEGLASSASSEMBLY 8INCH SHIELD CAP WITH VENT 77 4 SHIELD CAP WASHER 1 8 SHIELD FOR 8 INCH GAUGE GLASS GAUGE GLASS 8 INCH WASHER FOR SHIELD BASE 3 16...

Page 15: ...1 3...

Page 16: ...djustments and cleaning The resetting of safety thermostats and circuit breakers programming and temperature adjustments are the responsibility of the equipment owner The owner is responsible for prop...

Reviews: