
Installation
Leveling
1 Position the brewer on the countertop near an
electrical outlet that meets the
SPECIFICATIONS
.
Level the brewer left to right and front to back by
turning the bottom of the legs.
Connecting the Brewer Power Plug - Export Units
2 Connect the appropriate type of grounded power plug
to the end of the power cord coming from the back of
the unit.
INSTALLATION INSTRUCTIONS
II5
CAFE, INSTALLATION INSTRUCTIONS
121217B
WARNING:
Use the leveling legs to level the
brewer only. Do not use them to adjust brewer
height. Do not extend them higher than
necessary.
NOTICE -
This brewer is shipped with the
thermostat turned ON. DO NOT plug in the
brewer before pouring 3 pots/192 oz. of water
into the opening as instructed below; damage to
the heating element and/or thermostat will result.
&RQ¿JXUDWLRQ
YDULHV
&RQ¿JXUDWLRQ
YDULHV
Prepare the Brewer for Use
3 Place an empty glass decanter on the warmer deck,
under the spray head.
4 Insert the empty brew basket into the brew rails of the
brewer, below the control panel.
5 Fill the water tank by slowly pouring room temperature
water through the opening on the top cover, until
water starts running in a steady stream from the
brew basket. It takes approximately three pots or 192
PVODFTUPmMMUIFUBOLJOEJDBUFECZXBUFSDPNJOHPVU
of the brew basket.