![Curtis Dyna-Fog TYPHOON 2 2985 Manual Download Page 29](http://html.mh-extra.com/html/curtis-dyna-fog/typhoon-2-2985/typhoon-2-2985_manual_2700258029.webp)
CAUTION :
Never allow the flange assembly to be drawn in contact with the flange of the
*QD Bushing. There should be a gap from “1/8" TO 1/4" between them. If the
gap is closed, the shaft is seriously undersize.
Bolts of *QD Bushing:
1/4-20 x 1-1/4 , grade 5.
Bolts of Flange Assembly: 5/16-18 Socket Head Cap, equivalent to grade 8.
3.
The second *QD bushing is placed on the other shaft as described on step 1
and the second flange assembly is slipped over the bushing and assembled
to the distance of 1-1/8" (as indicated in below/left drawing) apart following
the instructions in step 2.
FLANGE ASSEMBLY MOUNTED DISTANCE
CHECKING THE FLANGE SPACING
PRIOR TO INSTALLING FLEXIBLE ELEMENT
4.
FOR PARALLEL SHAFTS : Using a scale or straight edge, check the flange
spacing and angular misalignment at four places 90° apart around the
coupling without rotating the flanges. The flanges should be aligned so that
the dimensions at all four places do not vary more than 1/32" for best results.
Check parallel misalignment by laying the straight edge across the flange
O.D. several places around the circumference of the coupling. Parallel
misalignment not to exceed 1/32" for best results.
FOR PARALLEL AND NON PARALLEL SHAFTS : For the longest coupling
life is always best to align couplings as accurately as possible upon the initial
installation.
29
Summary of Contents for TYPHOON 2 2985
Page 8: ...8 BATTERY BOX ...
Page 12: ...12 ...
Page 33: ...33 ...
Page 37: ...37 ...
Page 38: ...38 ...
Page 39: ...39 ...
Page 40: ...40 ...
Page 41: ...41 ...
Page 48: ...SAMPLE CONNECTIONS USING STEEL PLASTIC GRIPPER NUT 48 ...