background image

CURTMFG.COM

  

  

PRODUCT SUPPORT: 877.287.8634

  

  

18109-INS-RC

  

  

05/10/2021

  

  

ECN8300

  

  

PAGE 3

1

TOWING BASICS & SAFETY INFORMATION

For information on safely towing your trailer, visit 

curtmfg.com/understanding-towing

.

Step 1

Align the two platform halves (#1), as shown. Using the top two holes 

only, connect the platform halves (#1) and connecting plates (#3) with 

M10 x 20mm carriage bolts (#10) and M10 lock nuts (#9).

Hand tighten.

Step 2

Put the 2" shank (#2) under the middle of platform (#1). Place the 

support bridge (#13) under the 2" shank. Place the flat brace (#12) in 

the top middle of the platform. Connect by hand-tightening the M10 x 

75mm carriage bolt (#11) and M10 lock nut (#9).

Step 3

Using the bottom two holes, finish connecting the platform halves (#1) 

and connecting plates (#3) with M10 x 20mm carriage bolts (#10) and 

M10 lock nuts (#9). Hand tighten.

Fully tighten all of the bolts and 

lock nuts to the specified torque specs.

Step 4

Insert the 2" shank (#2) into the folding shank assembly (#4).

Align all of the holes. Insert the M16 x 80mm hex bolt (#8) through the 

hole closest to the cargo carrier and secure with M16 lock nut (#7).

The pin (#6) should be inserted in the hole closest to the vehicle. To 

fold the basket, remove pin, fold basket up, and place pin in the lower 

hole. The clip (#5) must always be attached to the pin.

10

9

3

10

13

9

10

3

11

12

2

9

8

7

4

6

5

Reviews: