background image

cuRtmFG.cOm

 • 

NEED ASSISTANCE?  •  1.800.798.0813  •  18153-INS-RA  •  PAGE 2

Figure 2

ASSemBLY

Step 1

 

Align the two platform halves (#1) on either side of the 
2" shank (#2). Insert the two M12*75 carriage bolts (#11) 
through the frame (#1), shank (#2) and other frame half (#1). 
Install M12 flat washers (#10) and M12 locknuts (#9) on the 
bolts (#11). Tighten to 80% only.

Step 2

 

Place the two connecting plates (#3) onto the front and back 
of the frames (#1). Install M10 bolts (#14) through the outside 
of the frames (#1). Add the M10 flat washers (#13) and tighten 
with M10 locknuts (#12) to the inside of the frames (#1).

1

1

10

10

2

4

6 8

2

9

Figure 3

Figure 4

14

13

12

3

5

7

Step 3  

Fully tighten all of the bolts and locknuts.

Step 4  

Connect the folding shank assembly (#4) to shank (#2) with 
M16*80 hex bolt (#8), pin (#6) and clip (#5).

Step 5 

To adjust the cargo carrier to the upright, folded position, 
remove the pin and clip (#5, #6). Turn the frame body up until 
it is vertical. Insert the pin (#6) through the shank (#2) and 
the lower hole of the folding shank assembly (#4). Insert clip 
(#5) into pin #(6).

Reviews: