background image

 

ATV Cargo Carrier 

Operation Manual & Safety Instruction 

Model: 18101 

Installation A 

 

1. 

Unpack all parts and identify according to FIG.1&2 and PARTS LIST 1&2. 

2. 

Position the rear flat rack (part no. 18100) so it is centered on the rear rack of the ATV. 

a. 

The rack extension of the ATV may have to be removed before the basket can be installed. 

3. 

Position any two sets of mount plates under the ATV rack so the mounting plates holes line 

up with the holes of the rear flat rack. Insert M8*50 bolts (part no. DB-11) through washers 

(part no. DB-10), rear flat rack, and into the mount plates. Leave the bolts loose until all the  

bolts have been installed. 

a. 

If the mount plates don't work, refer to the 

Assembly/Mounting Installation B

 on the back of 

this sheet. 

4. 

Align the rear flat rack evenly on the ATV rack and tighten all bolts. 

5. 

Insert the plugs (part no. DB-6) into square tubes  

 

PARTS LIST 

ITEM Q'TY PART 

NO. 

DESCRIPTION 

ITEM

Q'TY

PART 

NO.

DESCRIPTION 

RF-1 

REAR FLAT RACK 

DB-8 

MOUNT PLATE,5.4" 

N/A 

ATV RACK 

12 

DB-11 

BOLT M8*50 

DB-9 

MOUNT PLATE,3" 

12 

DB-10 

FLAT WASHER,M8 

DB-7 

MOUNT PLATE,11.75"

DB-6 

SQUARE TUBE PLUG

Reviews: