Cura1 ENSIGN+ Setup Instructions Download Page 2

Page 2

3

 

Connect 4G Module to a mains power source

Plug power adaptor into mains power outlet & turn on.

Plug power cable into “DC” socket.

4

 

Wait for connection to be established

White Power LED

Green 4G  
Status LED

The white Power LED will immediately illuminate 
when power is switched on.

When a 4G connection has been successfully 
established, the green 4G LED will blink quickly 
4 times every 2 seconds  This could take up to 5 
minutes (Please be patient).

5

 

Confirm your BSP is visible on ensigncloud.com

Open www.ensigncloud.com in a web browser and 
login with the username and password that was 
provided when your BSP was purchased. 

Your BSP’s status will be immediately visible after 
logging in. 

Reviews: