background image

ASSEMBLY STEPS

Step 1:

Put the legs (10) through hole of  

ash tray (9) and attach to the  

firebowl (6). Finger tighten to hold 

them together one by one. Tighten 

the screws using a screwdriver.  

Do not twist leg too tighten. 

Step 2:

1.  Install the bottom air vent (8)  

to fire bowl (6).

Step 3:

1.  Attach the lid handle (1) to the lid (3).
2.  Attach the lid air vent (2) to the lid (3).

Step 4:

Place charcoal grid (5) onto firebowl (6).  

Place cooking grid (4) on firebowl (6).

Reviews: