background image

 

- 2 -

 

 

Slide rail-panel 5** (hooks 

facing up) on top of frame 4.

 

**TIP: rail-panel 5 must be 

installed hooks facing up so

paper/pencil trays can hold.

 

 

Assemble the 2 wire-guides 

and slide/adjust them into 

posts where you will need 

them, preferably under 

work top level.   

 

 

Adjust the brackets and 

cantilevers to the mark level

(dot) on each post or at 

28-1/4 inch high. Cantilever 

goes on linear post C, and 

brackets go on other posts.

 

 

Display brackets in corners

and on all end posts. 

You just need to tighten the 

big chromed- screw to 

make them hold. 

 

 

Display and level the 2 work

tops then screw them (you 

may use an electric drill). 

Use the black wood screws.

 

10 

 

 

Insert each filler designed 

to hide the empty space on 

both posts B, as per 

pictures, right and left. 

Reviews: