Set-Up
Shear Pins
A pair of replacement auger shear pins and bow tie cotter pins
are included with your snow thrower in the manual bag. Store
them in your snow thrower’s dash panel until needed. See Fig.
3-10.
Chute Clean-Out Tool
The chute clean-out tool is fastened to the top of the auger
housing with a mounting clip and a cable tie at the factory. Cut
the cable tie before operating the snow thrower. See Fig. 3-11.
Figure 3-10
Push the rod toward the control panel until the hole in the hex
8.
rod lines up with the hole in the chute control input closest
to the chute control head and insert the cotter pin. See Fig.
3-8.
Note:
The second hole is used to achieve further
engagement of the hex rod into the pinion gear if required.
Refer to page 19 for Chute Control Rod adjustments.
Check that all cables are properly routed through the cable guide
9.
on top of the engine. See Fig. 3-9.
Note:
For smoothest operation, the cables should all be to
the left of the hex rod.
Chute Clean-Out Tool
Figure 3-11
Figure 3-8
Figure 3-9
9
s
ectiOn
2 — a
sseMbly
& s
et
-u
p
Summary of Contents for 726 TDE
Page 28: ...Notes 11 28 ...
Page 29: ...29 Section 11 Notes ...