![CTS FOS-5126 Series User Manual Download Page 13](http://html1.mh-extra.com/html/cts/fos-5126-series/fos-5126-series_user-manual_2694081013.webp)
13
2.4 Power ON
The Managed Switch can be used with AC power supply 100-240 VAC, 50
– 60
Hz or DC power supply 48V. The power switch is located at the rear of the unit
adjacent to the power connector.
After the Managed Switch is turned on, the Power LED indicators should light in
green and the FAN should spin.
Power Failure
In the event of power failure, unplug the power that is plugged into the switch at
the back of the device. When power is resumed, plug the power back to the
switch.
2.5 Connect the Switch to network
Connect to Network
The Managed Switch has 20 SFP with 4 combo ports and 2 SFP+ ports in front
panel. These 20 SFP ports can be plugged with 155Mbps or 1.25Gbps SFP
Fiber transceiver. Combo ports 21-24 can be plugged with 155Mbps, 1.25Gbps
SFP Fiber transceiver or 10/100/1000Base-T UTP connector. Uplink ports can
be plugged with 10Gbps SFP+ Fiber transceiver. The connection of the fiber
port must be matched, i.e. Transmitter to Receiver and vice versa.