![CTC Union CombiAir 12-UK 1x230V User Manual Download Page 19](http://html1.mh-extra.com/html/ctc-union/combiair-12-uk-1x230v/combiair-12-uk-1x230v_user-manual_2693335019.webp)
New builds
Newly built houses undergo a drying out process for a year. The house
can then consume significantly more energy than it would thereafter.
After 1-2 years the heating curve should be adjusted again, as well as the
offset heating curve and the building's thermostat valves, because the
heating system, as a rule, requires a lower temperature once the drying
process is complete.
19
CTC CombiAir
Chapter 2 |
The heat pump – the heart of the house