background image

1

General Information 

This guide contains information regarding the installation and safe handling of the photovoltaic module 

(hereafter is referred to as “module”) produced by China Sunergy (Nanjing) Co., Ltd (hereafter is referred to 

as “CSUN”.) 

Installers  must  read  and  understand  the  guide  before  installation.  Any  questions,  please  contact  our 

customer service department for further explanations. The installer should conform to all safety precautions in 

the guide and local codes when installing a  module.  Failure to follow  these instructions may result  in death, 

bodily injury or damage to property. 

Before installing a solar photovoltaic system, installers should become familiar with the mechanical and 

2

◆ 

◆ 

◆ 

◆ 

◆ 

◆ 

◆ 

◆ 

When  installing  the  system,  abide  with  all  local,  regional  and  national  statutory  regulations.  Obtain  a 

building permit where necessary.

◆ 

Installing solar photovoltaic systems may require specialized skills and knowledge. Installation should be 

performed only by qualified persons. Installers should assume the risk of all injury that might occur during 

installation, including, without limitation, the risk of electric shock.

◆ 

Abide with the safety regulations for all other components used in the system, including wiring and cables, 

connectors,  charging  regulators,  inverters,  storage  batteries  and  rechargeable  batteries,  etc.  Use  only 

Summary of Contents for 180-72M

Page 1: ...IEC Installation Guide Web Q CSUN J30 0002 To be a leading company of the renewable category of the world...

Page 2: ...Contents 1 General Information 2 Safety Precaution Storage and unpacking Installation Announcements 3 4 5 6...

Page 3: ...y injury or damage to property Before installing a solar photovoltaic system installers should become familiar with the mechanical and 2 When installing the system abide with all local regional and na...

Page 4: ...osed at all times Do not use or install broken modules If the glass is broken or the back sheet is torn contact with any modules surface or the frame can cause electric shock current Under normal outd...

Page 5: ...s to the modules manufacturer address ABC used to represent The 7th digit refers to the modules production month ABC used to represent For example A refers to January L refers to December The 8th digi...

Page 6: ...perly sealed to prevent leaks In some cases a special support frame may be necessary The roof installation of solar modules may affect the fireproofing of the house construction The modules Fire Resis...

Page 7: ...an electrical conductor per respective National Electrical Codes The grounding conductor must then make a connection to earth using a suitable earth ground electrode Attach a separate conductor as gro...

Page 8: ...5 6...

Page 9: ...Appendix 1 CSUN Main Modules Technical specifications Model Type Scope Cell Number Cell Size mm Module Size mm...

Page 10: ...72M CSUN 295 72M CSUN 290 72M CSUN 285 72M Electrical typical data Pmpp W 305 300 295 290 285 Voc V 44 9 44 8 44 6 44 5 44 4 Isc A 8 87 8 80 8 73 8 67 8 60 Maximum surface load capacity 5 400 Pa Hail...

Page 11: ...STC 1 000 W m AM 1 5 25 C Performance deviation of Pmpp 3 Performance deviation of Voc V Isc A Vmpp V and Impp A 10 Certified in accordance with IEC 61215 IEC 61730 1 2 and UL 1703 0 2 4 6 8 10 1000W...

Page 12: ...UN 285 72P CSUN 280 72P CSUN 275 72P CSUN 270 72P CSUN 265 72P Electrical typical data Pmpp W 290 285 280 275 270 265 Dimensions 1956 990 50mm L W H Maximum surface load capacity 5 400 Pa Hail maximum...

Page 13: ...STC 1 000 W m AM 1 5 25 C Performance deviation of Pmpp 3 Performance deviation of Voc V Isc A Vmpp V and Impp A 10 Certified in accordance with IEC 61215 IEC 61730 1 2 and UL 1703 0 2 4 6 8 10 1000W...

Page 14: ...60M CSUN 245 60M CSUN 240 60M CSUN 235 60M Electrical typical data Pmpp W 255 250 245 240 235 Voc V 37 5 37 3 37 2 37 0 36 8 Dimensions 1640 990 50mm L W H Maximum surface load capacity 5 400 Pa Hail...

Page 15: ...ns STC 1 000 W m AM 1 5 25 C Performance deviation of Pmpp 3 Performance deviation of Voc V Isc A Vmpp V and Impp A 10 Certified in accordance with IEC 61215 IEC 61730 1 2 and UL 1703 0 2 4 6 8 10 100...

Page 16: ...5 60P CSUN 230 60P CSUN 225 60P CSUN 220 60P Electrical typical data Pmpp W 245 240 235 230 225 220 Voc V 37 1 36 9 36 8 36 7 36 6 36 4 Dimensions 1640 990 50mm L W H Maximum surface load capacity 5 4...

Page 17: ...tions STC 1 000 W m AM 1 5 25 C Performance deviation of Pmpp 3 Performance deviation of Voc V Isc A Vmpp V and Impp A 10 Certified in accordance with IEC 61215 IEC 61730 1 2 and UL 1703 0 2 4 6 8 200...

Page 18: ...72M CSUN 190 72M CSUN 185 72M CSUN 180 72M Electrical typical data Pmpp W 200 195 190 185 180 Voc V 45 3 45 1 45 0 44 8 44 6 Dimensions 1580 808 35mm L W H Maximum surface load capacity 5400 Pa Hail...

Page 19: ...d test conditions STC 1 000 W m AM 1 5 25 C Performance deviation of Pmpp 3 Performance deviation of Voc V Isc A Vmpp V and Impp A 10 Certified in accordance with IEC 61215 IEC 61730 1 2 and UL 1703 0...

Reviews: