Crystal Vision
Hardware
installation
Demon 2 User Manual R1.4
5
07/09/2012
2 Hardware installation
The Demon 2 single height module can be used with the RM04, RM05, RM06, RM22
and RM36 rear connectors that will fit into all Crystal Vision rack frames (RM05 – not
1U frames). All modules can be connected or removed while the frame is powered,
without damaging the board.
2.1 Demon 2 configuration
Demon 2 board showing configuration jumpers
Link positions (Video)
Link
Function
Link 1-2
Link 2-3
PL10
Video sync level
300mV p-p into 75
approx2V
p-p
into
75
*PL6/2
O/P2 select
Analogue
SDI loop-through
*PL7/3
O/P4 select
Analogue
SDI loop-through
*PL8/4
O/P5 select
Analogue
SDI loop-through
*PL9/5
O/P3 select
Analogue
SDI loop-through
PL15
O/P1 configure
YC-Y
PL12
O/P1 configure
CVBS
PL11
O/P1 configure
G/Y
PL16
O/P2 configure
YC-C
PL13
O/P2 configure
CVBS
PL18
O/P2 configure
B/U
PL14
O/P3 configure
CVBS
PL17
O/P3 configure
R/V
Note:
*Links marked with an asterisk are double links and care must be taken to ensure correct
orientation.