
2
Crysalli/Western Pacific – 1739 Sabre Street Hayward, CA 800-229-4410 www.crysalli.com
Connect together the ends of the two red striped water bath re-circ tubes
with the “U” shaped 3/8” union JG fitting from the install kit. This creates a
continual/re-circulating loop of chilled water from the “Water Bath” of the
chiller to the tower and back.
10.Connect your water inlet line
from the water filter system to the “Water
Inlet” connection on the CR-UCM chiller use the 3/8” smooth to barb JG
adaptor if using the barbed hose from the install kit.
11.Connect a
High Pressure CO2 regulator
(CR-3741) to CO2 cylinder, then
connect CO2 line from unit to regulator. CO2 braided line has a stainless
steel nut on it and is labeled “co2”. Make sure connections are tight.
12. Run the clear overflow drain hose to floor drain or other waste drain for
initial over flow and condensation on start-up from ice bank formation.
13. Fill Water Bath: Remove lid and fill water bath with non-filtered tap water, to
¼” from top of standpipe. This is the white over flow tube in the water bath.
14. Turn on the Water to the system. Check all connections for leaks. Make sure
faucet shanks are tight to the tower. And JG fittings firmly placed on tubing.
15. Wrap any exposed trunk line tubing with insulated tape or foam. The “Water
bath” re-circ lines and exposed fittings may drip from condensation if not
wrapped up.
16. Plug unit power cord into 120-volt outlet. Toggle the ON/OFF rocker switch
to the ON position. Fan and compressor will turn on. Fan and Compressor will
automatically turn off when a complete ice bank is made and cycle on and off
to maintain it.
17.After the water is on, Open CO2 by turning knob on tank. Adjust regulator
between 55-75 PSI, check for leaks.
18. Unit will take between 3 & 4 hours to make a complete ice bank in the bath.
19. Pull open the still water and sparkling water faucets to run water through
the system. You will need to run the sparkling water faucet for several
minutes to cycle the carbonation system before full sparkling water will
dispense.
20. Once unit has built the ice bank in the water bath you are ready to dispense
chilled still and chilled sparkling water.