Installation
6-16
Figure 6-8: Electrical protection receptacle (representative view)
2)
Push the plug onto the connector and turn the locking ring clockwise until snug.
3)
To disconnect the plug, reverse the procedure. The system will not start if the EPD is
not connected to the helium compressor.
08Feb08
Electrical Protection
Receptacle
Summary of Contents for LNP-40
Page 1: ...Model LNP 40 Liquid Nitrogen Plant INSTALLATION OPERATION and ROUTINE MAINTENANCE MANUAL...
Page 4: ...1 1 N Section 1 Overview...
Page 10: ...2 1 N Section 2 Warranty...
Page 13: ...3 2 N Section 3 Safety...
Page 25: ...4 1 N Section 4 Inspection and Unpacking...
Page 29: ...5 3 N Section 5 Specifications...
Page 50: ...6 1 N Section 6 Installation...
Page 67: ...7 2 N Section 7 Operation...
Page 87: ...8 1 N Section 8 Routine Maintenance...