background image

Page 5

Page 7

Page 10

Figure 1

Installation

Before starting the installation, please read this
entire section first.  Be sure to install the bulkhead
gasket before you install the instrument.  Finger
tighten the screws that mount the instrument bracket
- do not use tools.

Page 12

driver to make the connections to the screw terminal
on the instrument case back as shown in figure 2.

l

Carefully check all your wiring against those

shown in figure 2.  If everything is wired correctly
you can mount the PR60  in the instrument hole.  Be sure
the bulkhead gasket is in place and use only finger
tension to tighten the bracket hold-down nuts    

Do not

overtighten the bracket or you may damage the case

do not use tools to tighten the nuts.

Displaying Pressure

Press the

 

:

 

key to display pressure (PSI or Bars).

Press the

 

s

 key to display pressure in percent (0 to

100%).

Setting Maximum Pressure Range

Press and hold down the 

:

 key for 10 seconds (until

you hear a long beep.) Use the 

and

 

s

 keys to set

the maximum pressure for your pressure sender,  either
in PSI or Bars. Once the maximum pressure is showing
on the display, press the 

:

 key for 1/2 second to save

this value into memory.

Bulkhead

Gasket

2-1/8" (55mm) hole

Mounting

Bracket

Finger tighten only - Do not use tools

Reviews: