Crown GCX-10 Installation & Operation Manual Download Page 13

INSTALLATION & OPERATION MANUAL 10056 REV 0 (03/21)

 PAGE

13    

OF 24

G

as

 F

ired

 S

teamer

P

ERIODIC

 M

AINTENANCE

P

ERIODIC

 M

AINTENANCE

 

 

WARNING

Disconnect the unit from the power supply before cleaning or servicing appliance.

IMPORTANT INSTRUCTIONS

Be sure to flush your boiler water level control daily. Failure to follow this procedure can cause the control to malfunction 

resulting in serious boiler damage.

The Boiler Water Level Control installed on your boiler requires periodic maintenance. As boiler water circulates into 

the float chamber, sand, scale and other sediment may be deposited in the float chamber. While the chamber has been 

designed with a large accumulation bowl, it is necessary to flush the sediment from the chamber by blowing down the 

control so that the accumulation of sediment does not interfere with the movement of the float in the control.
Control must be flushed at least once a day.

 

 

CAUTION

Protect yourself. When flushing control, hot water and steam will flow out of the drain.

When flushing control, note water level in gauge glass, allow the boiler to fill if necessary, and also to come up to 

temperature.

Before flushing control, note that water level in gauge glass is within operating range and the boiler pressure is at least 

6 psi. While the boiler is being fired, open blowdown valve at bottom of control by rotating the handle counterclockwise 

about 1/4 turn to fully open the valve.

Opening the blowdown valve also checks the cut-off operation. Float should drop shutting burners off, hot water and 

steam will flow out the drain flushing away sediment.

 

 

CAUTION

If burner does not shut off during blowdown, immediately discontinue use of appliance and call for service.

Continue draining water for about fifteen (15) seconds, from control until water is clean. Manually close valve. Recheck gauge 

glass. If water level has dropped significantly, wait for the boiler to restore water level and pressure and repeat if necessary.

Summary of Contents for GCX-10

Page 1: ...______________ WARNING Improper installation adjustment alteration service or maintenance can cause property damage injury or death Read the installation operating and maintenance instructions thoroug...

Page 2: ...intenance instructions thoroughly before installing operating or servicing this equipment NOTICE PURCHASER Instructions to be followed in the event that the operator of this appliance smells gas must...

Page 3: ...nts Important Notes For Installation and Operation 2 Service Connections 4 Introduction 5 Installation Instructions 6 Operation 9 Operation Instructions for Boilers with CSD 1 Controls 10 Operation In...

Page 4: ...36 68 5 1740 GCX 10 24 36 5 75 146 25 635 4 75 121 36 CABINET 2 75 70 24 CABINET 4 75 121 24 CABINET 6 75 171 36 CABINET G 3 5 89 5 75 146 6 75 159 36 CABINET 8 203 2 5 64 SERVICE CONNECTIONS ELECTRI...

Page 5: ...read 9 11 psi during operation 0 psi during shutdown 3 Burners will cycle on and off as required to maintain pressure 4 Compartment cooker is ready for use when READY light is on Place pans of food to...

Page 6: ...wed to enter the room to compensate for the amount of air removed by any ventilating system and for combustion for the gas burners Do not obstruct the air flow into and around the appliance Do not obs...

Page 7: ...tes collecting the run off grease in a drip pan usually installed with the filter A strong exhaust fan tends to create a vacuum in the room and may interfere with burner performance or may extinguish...

Page 8: ...e to clean out any dust dirt or foreign matter before connecting the line to the unit Codes require that a gas shut off valve be installed in the gas line prior to the steamer Make sure the pipes are...

Page 9: ...allow 20 minutes to fill the tank and generate steam OFF shuts off the boiler controls and opens the automatic blowdown valve emptying the boiler tank and releasing water and steam to the drain This s...

Page 10: ...erve water gauge sight glass to verify Operation Instructions for Boilers with CSD 1 Controls INITIAL START UP PROCEDURE 1 Open the manual gas shut off supply valve 2 Close the manual blowdown valve i...

Page 11: ...as valve When pressure drops to 9 psi the pressure switch closes the gas valve will open and ignition should occur Should the pressure rise more than 14 5 psi the Override Pressure Switch will close t...

Page 12: ...is entering the compartment Cooking pilot light will go off and ready pilot light will come on Buzzer must be shut off by turning the timer to its off position CAUTION An obstructed drain can cause p...

Page 13: ...be flushed at least once a day CAUTION Protect yourself When flushing control hot water and steam will flow out of the drain When flushing control note water level in gauge glass allow the boiler to f...

Page 14: ...ial growth and odors 3 Remove drain screens from inside compartment drains Using a plastic bottle brush and mild detergent clean inside the drain opening ensuring there is no food residue or blockage...

Page 15: ...in half gallon U S of CLR Descaling Solution or use the Optional Deliming Assembly DPA 1 available from your dealer For appliances equipped with CSD 1 descaling solution must be introduced through han...

Page 16: ...gh signal to switch at 14 5 psi on the gauge and the low signal to 13 0 psi 2 OVERRIDE PRESSURE SWITCHES Allow pressure to increase to 13 psi Set the high signal to switch at 13 psi on the gauge and t...

Page 17: ...ck that water level control valve is closed 5 Supply water pressure too low Automatic Blowdown Valve Does Not Drain 1 Defective blowdown valve 2 Heat exchanger build up of scalant clogging drain lines...

Page 18: ...as valve 8 Pressure switch may need to be replaced if relay is operating 9 Check gas control If energized but not operating have replaced Pilot Light Does Not Ignite electronic ignition 1 Gas control...

Page 19: ...Canned Vegetables 6 10 Lb Can Prunes Dried 12 to 15 Clams Frozen Fresh Cherrystone 10 12 5 6 3 Doz 3 Doz King Crab Frozen Claws Legs 4 4 6 2 1 2 lb 4 1 2 lb Lobster Tail Frozen Lobster Live 10 12 6 5...

Page 20: ...esh 1 6 Cut 8 5 lb Carrots Baby Whole Frozen Crinkle Cut Frozen Sliced Fresh 8 7 8 11 7 lb 4 lb 9 lb Cauliflower Flowerettes Frozen Fresh 6 7 8 4 lb 5 lb Celery 1 Diagonal Cut 7 5 lb Corn Yellow Whole...

Page 21: ...above pans since this will interfere with steam circulation between pans in the compartment Always preheat compartments for satisfactory results When time does not allow for defrosting of frozen vege...

Page 22: ...INSTALLATION OPERATION MANUAL 10056 REV 0 03 21 PAGE 22 OF 24 Gas Fired Steamer Notes...

Page 23: ...INSTALLATION OPERATION MANUAL 10056 REV 0 03 21 PAGE 23 OF 24 Gas Fired Steamer Notes...

Page 24: ...ement parts and occasional professional service may be necessary to extend the useful life of this appliance When service is needed contact a Crown Authorized Service Agency or your dealer To avoid co...

Reviews: