10
Table 2: Minimum Room Volumes Based On Sixteen Times Boiler Volume By Model Size
8
Boile r
M ode l
Ove r All
Le ngth
Jack e t
Ove r All
De pth
Jack e t
Ove r All
He ight
Floor To
Top Of
Jack e t
Boile r
Volum e
(Ft3)
M inim um
Room
Volum e
(Ft3)
32-475
36 3/4
32 1/4
46 5/8
32.0
511.7
32-570
42 1/4
32 1/4
46 5/8
36.7
587.4
32-665
47 5/8
32 1/4
46 5/8
41.4
663.1
32-760
53 1/8
32 1/4
46 5/8
46.2
738.8
32-855
58 1/2
32 1/4
46 5/8
50.9
814.5
32-950
64
32 1/4
46 5/8
55.6
890.2
32-1045
69 3/8
32 1/4
46 5/8
60.4
965.9
32-1140
74 7/8
32 1/4
46 5/8
65.1
1041.6
32-1235
80 1/4
32 1/4
46 5/8
69.8
1117.3
32-1330
85 3/4
32 1/4
46 5/8
74.6
1193.0
32-1425
91 1/8
32 1/4
46 5/8
79.3
1268.7
32-1520
96 5/8
32 1/4
46 5/8
84.0
1344.4
32-1615
102
32 1/4
46 5/8
88.8
1420.1
32-1710
107 1/2
32 1/4
46 5/8
93.5
1495.8
32-1805
112 7/8
32 1/4
46 5/8
98.2
1571.5
32-1900
118 3/8
32 1/4
46 5/8
103.0
1647.2
32-1995
123 3/4
32 1/4
46 5/8
107.7
1722.9
32-2090
129 1/4
32 1/4
46 5/8
112.4
1798.6
32-2185
134 5/8
32 1/4
46 5/8
117.1
1874.3
32-2280
140 1/8
32 1/4
46 5/8
121.9
1950.1
32-2375
145 1/2
32 1/4
46 5/8
126.6
2025.8
32-2470
151
32 1/4
46 5/8
131.3
2101.5
32-2565
156 3/8
32 1/4
46 5/8
136.1
2177.2
32-2660
161 7/8
32 1/4
46 5/8
140.8
2252.9
32-2755
167 1/4
32 1/4
46 5/8
145.5
2328.6
32-2850
172 3/4
32 1/4
46 5/8
150.3
2404.3
Figure 3: Clearances To Combustible Construction
Summary of Contents for 32 Series and
Page 2: ...2 ...
Page 4: ...4 Figure 1 Base Model General Configuration 2 II Specifications ...
Page 13: ...13 11 Figure 4 Multiple Base Assembly ...
Page 15: ...15 13 Figure 6 Assembly Of Sections Figure 5 Use Of Nipple Gauge ...
Page 20: ...20 18 Figure 14 Exploded View Of Jacket Assembly ...
Page 24: ...24 22 Figure 19 All Air From Outdoors Using Horizontal Ducts Into The Boiler Room ...
Page 34: ...34 Figure 26 Typical Near Boiler Piping When Using A Boiler Feed Pump 32 ...
Page 35: ...35 Figure 27a Recommended Steam Boiler Piping 1 or 2 Supply Connections Gravity Return 33 ...
Page 36: ...36 Figure 27b Recommended Steam Boiler Piping 3 Supply Connections Gravity Return 34 ...
Page 37: ...37 35 Figure 27c Recommended Steam Boiler Piping 4 5 or 6 Supply Connections Gravity Return ...
Page 42: ...42 40 Figure 30 Typical Water Boiler System Piping ...
Page 49: ...49 47 Figure 35 Series 32 Standard Boiler Wiring ...
Page 50: ...50 48 Figure 36 Series 32 CSD 1 Boiler Wiring ...
Page 65: ...65 63 Figure 42 Exploded View Base Parts ...
Page 67: ...67 65 Figure 43 Exploded View Gas Manifold Burners Pilot Assembly ...