Crosswater US-SP380 Installation Instructions Manual Download Page 2

Package Contents

x 2

x 4

x 1

x 1

x 1

x 1

Introduction

The 

water panel

 has been fully inspected throughout the production process and only leaves our factory 

after a 15

-step

 QC process.

 

      

Carefully remove the 

water panel 

from the box and check that all parts have been supplied.

Before beginning installation

,

 check for any damage that may have occurred during transport.

 

Note: Damage claims cannot be made during or after installation.

Improper installation shall result in loss of warranty in case of damage caused by impacts or rubbing against 
rough surfaces.

IMPORTANT: Please read these instructions carefully before begin

ning

 and retain for future 

reference.

 

We do not accept responsibility for any problems that may occur through incorrect 

installation.

Installation notes

The installation must comply with all plumbing codes including local codes and be installed by a licensed 

plumbing contractor. 

 It is recommended that two people carry out the installation.

IMPORTANT

Before installing a new 

water panel

 it is essential that 

the supply lines are thoroughly flushed 

in order to remove any remaining debris, solder or other impurities. Failure to carry out this simple 

procedure can cause problems or damage to the function of the water panel. 

Installing shut-off valves on incoming supply lines is recommended for ease of maintenance. 

Turn off the main water supply before connecting to any existing pipe work or doing any 

maintenance.

WARNING! Please check for any hidden pipes and cables, electric or otherwise

,

 before drilling holes in 

a wall

, ceiling or floor

.

2

Reviews: