
Package Contents
x 2
x 4
x 1
x 1
x 1
x 1
Introduction
The
water panel
has been fully inspected throughout the production process and only leaves our factory
after a 15
-step
QC process.
Carefully remove the
water panel
from the box and check that all parts have been supplied.
Before beginning installation
,
check for any damage that may have occurred during transport.
Note: Damage claims cannot be made during or after installation.
Improper installation shall result in loss of warranty in case of damage caused by impacts or rubbing against
rough surfaces.
IMPORTANT: Please read these instructions carefully before begin
ning
and retain for future
reference.
We do not accept responsibility for any problems that may occur through incorrect
installation.
Installation notes
The installation must comply with all plumbing codes including local codes and be installed by a licensed
plumbing contractor.
It is recommended that two people carry out the installation.
IMPORTANT
!
Before installing a new
water panel
it is essential that
the supply lines are thoroughly flushed
in order to remove any remaining debris, solder or other impurities. Failure to carry out this simple
procedure can cause problems or damage to the function of the water panel.
Installing shut-off valves on incoming supply lines is recommended for ease of maintenance.
Turn off the main water supply before connecting to any existing pipe work or doing any
maintenance.
WARNING! Please check for any hidden pipes and cables, electric or otherwise
,
before drilling holes in
a wall
, ceiling or floor
.
2