Make sure that the hot and cold inlet pipes have been installed 

correctly.

l

The inlet pipes should be perpendicular to the wall, have a 

maximum length of 13/16”, are level and are 7

-

7/8” apart as

shown opposite.

l

Position the valve onto the wall and mark the position of the 

fixing holes (x4).

l

Drill the fixing holes.

l

Mount the exposed valve to the wall using suitable fixings for the 

wall construction.

l

Connect the hot and cold water supplies and main outlet.

l

Once valve is installed add 

the 

riser rail to the top outlet

. If 

applicable, 

to install the bottom spout remove the stop located at 

the bottom of the valve and connect on/off lever then spout. 

l

Turn on the water supplies and test all connections for 

water leaks.