
Basin & Basin Unit Installation
Step 1
Step 2
Remove the drawers before installation.
Pull out fully, lift the front, pull out again, lower and fully re move.
Plan unit position
Decide on the position and height of the unit. The
recommended basin height is between 860mm and
870mm from floor to top of basin.
Step 3
‘Wall bracket’ installation
Use the measurements above, to position the ‘wall brackets’.
a: Important: The measurements given above are the maxi-
mum the brackets can be spaced apart, the brackets must fit
within that measurement.
b: Mark the bracket fixing holes onto the wall. Drill Ø 8mm
holes, insert the wall plugs on solid walls and attach the brac-
kets (c).
Important: If the basin unit and/or basin are not fitted level this
may result in the basin not draining correctly.
Position the unit on the brackets.
Removing bracket from the wall
2
600 and 800mm wide basin units
1000 and 1200mm basin units