Crosswater SE350DC Installation Instructions Download Page 3

4

SE350DC

INSTALLATION

INSTALLATION

First shut off your water heating system then, with your mains stop cock closed, open the 
lowest hot and cold taps in the house and allow to run until the cold storage tank and pipes 
are empty (the hot water storage cylinder always remains full).
Fitting isolating valves to the inlet feeds is recommended for ease of maintenance.

!

INSTALLATION
           Remember to turn off the mains water supply before connecting to any existing 
           pipe work.
        

RUBBER
WASHER

PLASTIC
WASHER

RUBBER
WASHER

HANDLE

(HOT)

HANDLE

(COLD)

PREPARATION AND BYELAW REQUIREMENTS

First  shut  off  your water heating system then, with your mains stop cock closed, open 
the  lowest  hot  and  cold  taps in the house and allow to run until the cold storage tank 
and  pipes  are empty (the hot water storage cylinder always remains full). 

INSTALLATION

Each side body  is fitted  to  the  bath  and  secured with  the  back  nuts  both 
above  and  below  the  bath. The chrome trim set is fitted from above the bath 
onto the side bodies to allow operation of the product.

ATTENTION
Before  installing  the new taps it is essential that you thoroughly flush through 
the supply pipes in order to remove any remaining   swarf,  solder or other 
impurities. 
Failure to carry out this simple procedure could cause problems or damage to 
the workings of the taps.

Having first  checked all  new connections, turn  on  the mains stop cock, close all taps
except the new mixer and as the system starts to refill check for leaks.
Once you have satisfied yourself that there are no leaks, switch on the water heating.

3

PLASTIC

 

GASKET

VALVE 
BODY

Reviews: