
4
SE350DC
INSTALLATION
INSTALLATION
First shut off your water heating system then, with your mains stop cock closed, open the
lowest hot and cold taps in the house and allow to run until the cold storage tank and pipes
are empty (the hot water storage cylinder always remains full).
Fitting isolating valves to the inlet feeds is recommended for ease of maintenance.
!
INSTALLATION
Remember to turn off the mains water supply before connecting to any existing
pipe work.
RUBBER
WASHER
PLASTIC
WASHER
RUBBER
WASHER
HANDLE
(HOT)
HANDLE
(COLD)
PREPARATION AND BYELAW REQUIREMENTS
First shut off your water heating system then, with your mains stop cock closed, open
the lowest hot and cold taps in the house and allow to run until the cold storage tank
and pipes are empty (the hot water storage cylinder always remains full).
INSTALLATION
Each side body is fitted to the bath and secured with the back nuts both
above and below the bath. The chrome trim set is fitted from above the bath
onto the side bodies to allow operation of the product.
ATTENTION
Before installing the new taps it is essential that you thoroughly flush through
the supply pipes in order to remove any remaining swarf, solder or other
impurities.
Failure to carry out this simple procedure could cause problems or damage to
the workings of the taps.
Having first checked all new connections, turn on the mains stop cock, close all taps
except the new mixer and as the system starts to refill check for leaks.
Once you have satisfied yourself that there are no leaks, switch on the water heating.
3
PLASTIC
GASKET
VALVE
BODY