Crosswater CANVASS FURNITURE Series Assembly Instruction Download Page 1

CANVASS FURNITURE RANGE

IMPORTANT - Advice and safety - Please read before installation

Tools & equipment needed: 

Phillips screwdriver, Spirit level, Ruler/tape measure.

   

1

Canvass Leg Set x2

x12

 

 

x2

x2

x4

Please  read  these  instructions  carefully  before  starting  installation 

and keep in a safe place for future reference. ENSURE the room is well 

heated and ventilated.

Check the contents of the pack carefully before installation. Crosswater will 

If  any  fault  is  found  with  materials  or  workmanship,  it  must  be  reported 
immediately  to  the  manufacturer.  Remedial  action  will  be  taken,  based  on 
information  received,  on  condition  that:  1.  Full  details  are  supplied  to  the 

manufacturer is informed of any damage/shortages prior to installation. 4. The 
product has not been installed, or attempts have been made to install. 
We  do  not  accept  responsibility  for  any  problems  that  may  occur  through 
incorrect installation. 

 

           Advice & Safety

This product should only be installed by a suitably quali ed Plumber/installer. 
Should the installation be completed by a non-quali ed person any product 
guarantee maybe considered invalid. For a claim made under our warranty 
written certi cation of your installers quali cations can be required.
It is advised that all doors and drawers are removed prior to  tting to avoid 
unnecessary damage occurring.
It is recommended that the furniture and accessories are installed after tiling, 

be easily removed if required in the future.
This document has been prepared for your guidance, you must exercise due 
care at all times.
Please note that some units are heavy. Always take care when lifting, and
follow health and safety guidelines. It is recommended that 2 people carry out 
the installation of larger basin/vanity units over 30Kgs gross weight.

Warning!

 ! Please check for any hidden pipes or electrical cables before  drilling 

holes in the  oor or walls.
When using power tools always follow the manufacturer’s user instructions.

the  wall  can  take  weight  of  units  detailed  above.  Before  installing  a  wooden 
bathroom  unit  into  a  new  property,  extension  or  recently  plastered  room  we 
strongly  advise  the  building/room  is  completely  dry,  well  ventilated  and 
adequately heated.

Care & Cleaning

Ceramic,  glass  and  cast  mineral  marble  basin  products  should  be  cleaned 
regularly with warm soapy water, then rinsed with clean water and, if desired, 
dried and polished with a soft cloth. Lime scale deposits can be removed using 
a 50:50 solution of warm water and lime scale remover and soft clean cloth. 

Regularly clean worktop, carcass, legs and drawer using a well wrung chamois 

year using a natural bees wax.
Do  not  use  abrasive  cleaners  or  bleach  in  this  will  permanently  damage  the 
lacquered and varnished surfaces.
If any mainten

LV CVLEGS

0,4 Kgs

Reviews: