Beam
c
u
A-306-0
7/09
A-30
6-0
7/09
Links
3
© 2019 HALFEN · INST_HDB 04/19 · www.halfen.com
HALFEN HDB Shear rails
Assembly Instructions
Inverted installation (from below)
Fixing the HDB elements to the reinforcement
Floor slab
Installation
perpendicular
to
the upper reinforcement:
without clip bars.
Note:
• always place HDB elements on top
of the upper reinforcement
• to avoid overlapping clip bars can be
attached anywhere on the spacer bar
HDB Element, e. g. with 2 studs
Installation
without
clip bars: the
HDB-S elements are placed on top
of the links.
Installation
parallel
to the upper
reinforcement using
clip bars
.
Correct:
Installation
with clip bars
Incorrect:
Insuffi
cient
concrete cover!
Mixing smooth and ribbed anchors at one column
is not allowed!
It has proven practical to secure the installation rail to
the upper reinforcement by wire.
HDB Elements can also be installed in
an inverted position in prefab slabs or
when the upper reinforcement is ex-
tremely congested. (Installation bar at
the bottom of the element). The full
load capacity of the HDB Shear rails is
also guaranteed in this position.
HALFEN Shear rails type HDB-F are
installed from above in prefab slabs.
See brochure “HALFEN HDB Punching
shear reinforcement and shear rein-
forcement - Technical product informa-
tion” for further information.
With
timber formwork
, the HDB Ele-
ments can be nailed to the formwork
together with the spacers.
With
steel formwork
, the HDB
Elements should be tied to the lower
reinforcement with wire.
Spacer type
HDB ABST
Material: KS = Plastic,
available for concrete cover
c
nom
= 15, 20, 25, 30, 35, 40 mm
HDB-S
Steel or timber formwork
Spacer
Attach
spacer
Dimension marking
c
nom
on spacer