background image

Docking Station/Charger                                                              Crestron 

ST-DS

6  

••

  Docking Station/Charger: ST-DS

Operations Guide - DOC. 5738A

Method 3: ST-BTP Installed in an Active Touchpanel

This method is identical to method 2, except that the touchpanel is active (ON)
while charging. As a result, the time to fully charge a discharged ST-BTP can take
up to three hours.

Fully Discharging the ST-BTP

Due to the memory effect of nickel-cadmium (NiCad) cells, Crestron recommends
that the ST-BTP be fully discharged for every 25 charge/discharge cycles. The
ST-BTP can be fully discharged while in the touchpanel. A button to fully discharge
the touchpanel should be available within a designated screen design. This button
has a special software identity (reserve join number) and can be recreated and
programmed onto any page in the touchpanel project. Consult your Crestron dealer
if this feature cannot be located.

Problem Solving

Troubleshooting

The table below provides corrective action for possible trouble situations. If further
assistance is required, please contact a Crestron customer service representative.

ST-DS Troubleshooting

TROUBLE

POSSIBLE 

CAUSE(S)

CORRECTIVE ACTION

Green PWR 
LED does not 
illuminate.  

ST-DS is not 
receiving power. 

Confirm that power pack securely plugged into 
outlet and that the connector is properly attached 
to the ST-DS. 

Red CHG 
LED blinks 
once per 
second. 

ST-DS is in "charge 
pending" mode.

The rechargeable power pack is either too hot/cold 
or has extremely low voltage.  No action is 
necessary. The ST-DS monitors the  ST-BTP and 
begins a fast charge as soon as conditions are 
favorable. Charging occurs when the ST-BTP 
temperature is between 59-86 °F (15-30 °C).

Red CHG and ST-DS has 

Properly position the ST-BTP in the ST-DS cavity.  

RDY LEDs 
blink four 
times per 

intermittent contact 
with the ST-BTP.

The four contacts may be dirty. Unplug the 
external power pack and clean the contacts with a 
dry, lint-free cloth.

second. 

Incorrect external 
power pack being 
used.

Verify that the external power pack is the 
recommended power supply (i.e., Crestron part 
no. PW-1215 (110v) or PWI-1215 (210v)).

Red CHG and 
RDY LEDs 
oscillate back 
and forth. 

Hardware Error

Stop using the ST-DS.
Contact an authorized Crestron Dealer or Crestron 
Customer Service.

Summary of Contents for ST-DS

Page 1: ......

Page 2: ...This document was prepared and written by the Technical Documentation department at Crestron Electronics Inc 15 Volvo Drive Rockleigh NJ 07647 1 888 CRESTRON...

Page 3: ...Description 1 Physical Description 2 Setup 4 Power Source 4 Using the ST DS to Charge the ST BTP Rechargeable Power Pack 4 Fully Discharging the ST BTP 6 Problem Solving 6 Troubleshooting 6 Further In...

Page 4: ......

Page 5: ...BTP Rechargeable Power Pack on page 4 1 The ST DS charges the ST BTP alone 2 The ST DS charges the ST BTP while the rechargeable power pack is installed in a touchpanel and the touchpanel is not in us...

Page 6: ...ront panel there are three LEDs for indicating the unit s current status The cavity accommodates either the ST BTP with optional ST DS charging guide or in some cases a Crestron wireless touchpanel wi...

Page 7: ...vided to the ST DS via the specified external power pack CHG Charge This red LED illuminates when a ST BTP is inserted into the ST DS cavity and the contacts of each touch The LED remains ON while the...

Page 8: ...parks and open flame Do not smoke while the ST BTP is being charged WARNING Avoid damage to the ST BTP and possible physical harm use only the specified external power pack PW 1215 110v or PWI 1215 22...

Page 9: ...his method only applies to certain Crestron wireless touchpanels In this method the ST BTP is properly installed into the touchpanel Position the touchpanel into the ST DS cavity as shown on the next...

Page 10: ...red please contact a Crestron customer service representative ST DS Troubleshooting TROUBLE POSSIBLE CAUSE S CORRECTIVE ACTION Green PWR LED does not illuminate ST DS is not receiving power Confirm th...

Page 11: ...l Crestron Latin America at 525 260 4336 For local support from exclusive Crestron factory trained personnel call In Australia call Soundcorp at 613 9488 1555 In New Zealand call Amber Technologies at...

Page 12: ...date of shipment to purchaser Disk drives and any other moving or rotating mechanical parts are covered for a period of one 1 year CRESTRON warrants all its other products for a period of one year fro...

Page 13: ...being fully discharged the unit learns not to maintain a full charge This can be avoided by fully discharging the ST BTP every 25 charging cycles ST BTP The ST BTP is a rechargeable power pack include...

Page 14: ...Docking Station Charger Crestron ST DS 10 Glossary of Terms Operations Guide DOC 5738A This page intentionally left blank...

Page 15: ...Crestron ST DS Docking Station Charger Operations Guide DOC 5738A Docking Station Charger ST DS 11 This page intentionally left blank...

Page 16: ...Crestron Electronics Inc Operations Guide DOC 5738A 15 Volvo Drive Rockleigh NJ 07647 04 01 Tel 888 CRESTRON Fax 201 767 7576 Specifications subject to www crestron com change without notice...

Page 17: ...Crestron ST DS Docking Station Charger Operations Guide DOC 5738A Docking Station Charger ST DS 13...

Reviews: