quickstart guide
MP-FS100 PAK
www.crestron.com
888.273.7876
201.767.3400
Specifications subject to change
without notice.
MP-FS100 PAK
For details, refer to the latest version of the
MP-FS-RX1/RX2
Operations Guide, Doc. 7164.
QUICKSTART DOC. 7161B (2030815) 0
8
.11
FreeSpeech
®
Single-Channel Wireless Mic System
1
The outer jacket of the cable must
extend into the molded plastic channel
of the MP-FSIR and under the wire
retaining guides, as shown.
Connect the
T
,
R
, and
S
terminals of
the MP-FSIR to the
T
,
R
, and
S
terminal
positions of the supplied 3-pin
detachable connector for the
BEACON
SENSOR
T
,
R
, and
S
terminals of the
MP-FS-RX1 receiver, and plug in the
connector.
If using the CBL-PWR-CTRL-P-TL-50
cable, connect drain and black together
to the
S
pin, connect red to
T
and white
to
R.
Blunt cut both ends of the blue
conductor and do not use.
If using a shielded cable, also connect
the shield to the
S
pin at the receiver
end only.
System Components
1
The following items are included in the MP-FS100 PAK kit:
•
One single-channel receiver, MP-FS-RX1
•
One dual docking station/charger, MP-FSDS2
•
One IR beacon sensor, MP-FSIR
•
One wireless microphone, MP-FSMIC, with lanyard and LED
code chart
•
One power pack: 2.0 Amps @ 24 Volts DC, 100-240 Volts AC,
50/60 Hz (for MP-FS-RX1)
•
One power pack: 1.2 Amps @ 5 Volts DC, 100-240 Volts AC,
50/60 Hz (for MP-FSDS2)
The following items are available separately:
•
PA audio sensor, MP-FS-PAS
•
Tabletop mic stand, MP-FSTTS
•
Ceiling-mount speakers, FSDI8 (Pair)
•
Surface-mount speakers, FS6 (Pair)
•
Speaker wire, CBL-SPK-P-35
• CBL-PWR-CTRL-P-TL-50
Install the dual docking station/charger as follows:
1. Select an appropriate location (tabletop, desk, shelf).
2. Connect the supplied power pack to the docking station and then to
line power.
3. The green LED on the docking station indicates power is applied.
Install the wireless microphone (mic) as follows:
1. Make sure power is applied to the docking station/charger
(the green LED is on).
2. Place
the
MP-FSMIC
in either position of the docking station, and
allow it to charge for at least two hours. When the battery is fully
charged, the mic's Status LED blinks green.
NOTE:
The mic is “keyed” and only fits into the charger in the orientation
shown in the following illustration.
3. Use the included magnetic clip for lapel or lanyard attachment, or
place the mic in the tabletop stand accessory (available separately).
During operation, the mic should be positioned approximately four
inches (100 mm) below the speaker's chin.
FS
FS
MP-FSIR
FSDI8
FSDI8
MP-FS-RX1
Desk,
Table,
Shelf . . .
Instructor
Students
w/ MP-FSMIC
Install MP-FSDS2 Dual Docking Station/Charger
2
Power Pack
Green
LED
1.2 Amps @
5 Volts DC
100-240 Volts AC
50/60 Hz
Install MP-FSMIC Wireless Microphone
3
Room Setup and Speaker Placement
4
Status LED
Use the diagram below as a guide for placing the FreeSpeech
®
system
components in the classroom.
1. Locate the MP-FS-RX1 receiver on any flat surface such as a desk, table,
or shelf.
2. Crestron
®
recommends using FS6 surface mount speakers
OR
FSDI8
ceiling mount speakers. Place FS6 speakers on the walls between the
instructor’s usual location and the students, aimed toward the students;
place FSDI8 ceiling mount speakers at the rear of the room behind the
students.
3. The MP-FSIR IR beacon sensor(s) should be centrally located on the
ceiling or wall, away from fluorescent lighting and windows, with direct line
of sight to the MP-FSMIC wireless microphone.
System Hookup
5
Install all accessory hardware and all required interconnecting cables.
1. Install 2-conductor cables between the MP-FS-RX1 receiver and the speaker
locations. Crestron recommends its plenum rated 16 AWG speaker cable
CBL-SPK-P-35. Use the supplied connectors at the receiver end, and connect to
the speakers following their included instructions.
2. Install any optional devices, such as the MP-FS-PAS audio sensor, following their
included instructions.
3. Attach the supplied antenna to the receiver.
4. Install a 3- or 4-conductor cable (minimum 24 AWG) up to 50 feet (~15 meters)
maximum, between the MP-FSIR location and the receiver. Refer to the illustration
below for mounting and hookup details.
As an alternative, use Crestron's CBL-PWR-CTRL-P-TL-50 or equivalent cable.
NOTE:
Up to two MP-FSIR units can be connected in parallel to each of the two
MP-FS-RX1
BEACON SENSOR
ports, allowing for a total of four MP-FSIRs.
5. Connect the included power supply to the receiver and then to line power.
Mount the IR beacon sensor directly to
the ceiling or wall using the supplied
1-1/2" 8-16 Phillips head screws and
plastic wall anchors (if required). It can
also be mounted to a single-gang
electrical box or an octagonal electrical
box.
MP-FSIR Hookup & Mounting
l
nal
N
3.53 in
(90 mm)
3.23 in
(82 mm)
S R T