DMS-R-IM
Appendix
April 7, 2021
Digital Modular System - Rinse
9-19
9.8
Resistivity Meter Set Point Adjustment
(Optional Item)
Figure 9-3: Resistivity Meter
Follow the following steps to adjust resistivity meter set point:
Step
Description
1
Power ON the system.
2
Locate Myron Resistivity Meter.
3
Using a screwdriver, unfasten the four (4) screws of resistivity meter
monitor’s front panel.
4
Being careful not to strain the cable, remove resistivity meter
monitor’s front panel cautiously. Warning! Do not pull more than 8
inches/20cm or you could damage the wiring harness.
Set Point
Display