background image

ODC 915

O

OU

UTTD

DO

OO

ORR D

DIISSC

CO

OV

VEERRY

Y C

CRRA

AFFTT

ASSEMBLY INSTRUCTIONS

I.  PADDED SEAT ASSEMBLY

1.

Assemble Seat Back to Seat Bottom using Seat Pins (see figure 1).

II.  FRAME ASSEMBLY

NOTE:  Your frame assembles using (8 ) Short Snap Pins and (4) Screws for seat installation.  Please follow

instructions accordingly.  See figure 3 for Snap Pin installation.           

1.

Assemble Seat to Seat Support Frame Member using 4 seat screws (see figure 1).

2. 

Assemble Seat Support Member to Left and Right Frame Members using (4) Short Snap Pins (see figure 4).

3.   

Remove  Protective Support Bar and assemble Cargo Deck to back of Left and Right Frame Member using (2) Short 

Snap Pins (see figure 4)

4.

Assemble Foot Bars to front of Left and Right Frame Member (see figure 4).

5. 

See figure 9 and 11 for use of Underseat Lift and Lock Anchor System.

III.  PONTOON INFLATION

NOTE:  Use the large cone adapter provided with your pump.  See figure 7 for a detail of the 

valve assembly.  Before inflation, be sure to fully seat each valve assembly into the 

pontoon, screwing tightly by hand. When fully seating valve assembly,  be sure that the 

valve plate is in place around valve assembly and not restricting the valve assembly from 

a full seal.  After inflating, be sure to fully seat the top cap on to each valve assembly,

screwing tightly by hand.  Both are required for an airtight seal.

1.  

Inflate each pontoon.  The valve is located at the top and center of each Pontoon (see figure 5).   

Inflate until firm (do not over inflate).

2.  Again, be sure top valve cap and valve assembly are fully seated to achieve airtight seal

.

PONTOON DEFLATION: 

Unscrew entire valve assembly from pontoon.

IV. ATTACH PONTOONS TO FRAME

NOTE:  Always  inflate the Pontoons first, before attaching to frame.

1.

Position inflated Pontoons under the Left and Right Frame Members with ODC 915  logo oriented to 

the outside.  

2. 

Attach each Pontoon to frame using (8) Cam Lock Straps.  Slip each strap through D-Ring on Pontoon, around   

frame and pull tight through Cam Lock Buckle.  NOTE: Be sure the straps are pulled tight through the 

Cam Lock Buckles (see figure 6).

V. OAR & OARLOCK ASSEMBLY

1.

Slide the Oar Stop over the handle end of the Oar Shaft and tighten Oar Stops with nut and bolt provided.

2. 

Assemble 2 oar shaft pieces and blades.

3.  

Place Oarlock Bushing over Oarlock shaft and place Oarlock into frame.  Frame has 3 Oarlock postions for a 

custom fit.  Attach split ring at end of Oarlock shaft to secure Oarlock in place (see figure 8)

TTM

M

TTM

M

      

  

 

          

 

      

 

    

 

      

    

Reviews: