
EN | 2019 |
LOUNGER M INSTALLATION
|
21
20
|
LOUNGER M INSTALLATION
| 2019 | EN
ANCHORING & BALLAST
There are three options for anchoring & ballast: 1 Ground pins, 2 Concrete screws, 3 Ballast plates.
After
the structure has been anchored remove the CS-0688 Positioning cables.
STEP 17
BALLAST PLATE OUTSIDE
The ballast plates can be used when drilling
or the use of groundpins is not allowed.
BALLAST PLATE INSIDE
The ballast plates can be used when drilling
or the use of groundpins is not allowed.
CS-0384
Ballast plate
CS-0384
Ballast plate
Put tension on the CS-0718 Tensioning cables.
STEP 18
CS-0715
End profile
CS-0965
Adapter tool
At last put the cover on full tension at the CS-0715 End profiles
by using the CS-0965 Adapter tool on the drill.
STEP 19
CONCRETE SCREWS
Anchoring for permanent fixation on
a hard surface (when drilling is allowed).
GROUND PINS
Anchoring for permanent fixation
on soft ground (gras / sand / gravell).
CS-9003
Concrete screws
CS-9001
Groundpin S