© Copyright 2005, Creative Playthings, Printed in U.S.A.
CONNECTING BRIDGE
19715-100 Rev E (07-20)
Page 4
BRIDGE
ASSEMBLY INSTRUCTIONS
STEP 8 - Install Wall Slats:
Locate 20 Wall Slats and align them evenly against the
Hand Rails. The spaces between each Wall Slat should be
approximately 2-7/8". Secure each Wall Slat using four #10
x 1-5/8" Screws.
illustration #9
illustration #10
STEP 9 - Cut Away Top Rail:
Note: Only cut away the Top Rail if the gym tower has a
Wooden Roof.
Make marks on the Top Rail flush with the inside of the
Hand Rails. Use the Circular Saw to cut away the Top Rail
to create a entrance.
Remember to stain the cut away surfaces.
STEP 10 - Hole Caps:
Insert Hole Caps into the counter-bored holes on the Bridge
Posts and Bridge Rails.
Top Rail has been omitted for clarity.
illustration #8
STEP 7 - Install Hand Rails:
Locate two Hand Rails and align the holes to the holes on
the Bridge Posts. Fasten the Hand Rails to the Bridge Posts
using four 5/16 x 4" Hex Assemblies each.
Top Rail has been omitted for clarity.
Note: Only cut away the Top Rail if the
gym tower has a Wooden Roof.