background image

pg 18 of 27

REF: L106 - LILLIPUT PLAYTOWN SIX

Installation Instructions

ATTACH THE ENTRANCE RINGS and CENTRE RINGS

ATTACH ENTRANCE RINGS USING FM80 BRASS SCREWS

ATTACH CENTRE RINGS USING THE PLAYTEC CLIP SETS / M12 X 80mm SQUARE CUP BOLTS / M12 NYLOCS / M12 COVERED ENDS

Attach FIRST/LAST PLAYTEC SLATS and 30X30 BOX SECTION to the RINGS

USING 0B/N1 TORKTAINERS

10

11

Summary of Contents for LILLIPUT PLAYTOWN SIX L106

Page 1: ...LILLIPUT PLAYTOWN SIX Installation Instructions REF L106 LILLIPUT PLAYTOWN SIX pg 1 of 27...

Page 2: ...RTS required x6 TOWERS STANDARD FLOOR 90x90 x1 LILLIPUT CLIMBING WALL x1 RAMP PULL ROPE x2 90 x 90 CLATTERBRIDGE FLOOR x4 90 x 90 STANDARD FLOOR x1 RAMP HEX x1 RAMP METAL FRAME x7 PRE ASSEMBLED PANEL...

Page 3: ...pg 3 of 27 REF L106 LILLIPUT PLAYTOWN SIX PARTS required PARTS required x1 0 6m SLIDE x1 CLATTERBRIDGE x1 CLIMBING NET x1 NET TUNNEL x1 ROPE WALK x1 NET CLIMBER x1 CLIMBER GROUND ANCHOR x2 SLIDE CLIPS...

Page 4: ...x3 FM40 Brass screws x1 BOTTOM OF TRAVERSE x1 FIREFIGHTERS POLE AND BRACKET x1 TOP OF TRAVERSE x12 M12 x 200SQUARE CUP HEX BOLTS x12 M12 x 150 SQUARE CUP HEX BOLTS x2 M12 x 100 SQUARE CUP HEX BOLTS x6...

Page 5: ...27 REF L106 LILLIPUT PLAYTOWN SIX PARTS required CRAWLING TUNNEL PARTS required x2 FIRST LAST PLAYTEC SLAT x7 PLAYTEC SLAT x1 HEX FLOOR x2 PLAYTEC TUNNEL ENTRANCES x2 CENTRAL HEX RINGS x4 PLAYTEC CLI...

Page 6: ...NEL PARTS required x18 M12 NYLOC x18 Covered Ends x8 FM80 Brass screws x4 M12 x 100 SQUARE CUP HEX BOLTS x8 M12 x 80 SQUARE CUP HEX BOLTS x6 M12 x 75 SQUARE CUP HEX BOLTS x36 N1 TORKTAINER x36 0B TORK...

Page 7: ...6 TOP ROOF CLIP x12 SIDE ROOF x6 FRONT ROOF x6 BACK ROOF PARTS required RUSTIC ROOF x24 TOP RUSTIC ROOF x120 HALF ROUND TIM x12 x12 RR3 RR2 RR2 RR2 RR1 RR1 x60 N1 TORKTAINER x60 3B TORKTAINER x24 FM80...

Page 8: ...TOWN SIX TOOLS required TIMBERS required L106o L106f L106e L106e L106i L106i L106p L106q L106a L106g L106d L106h L106b L106b L106c L106c L106g L106b L106g L106m L106b L106b L106j L106n L106k L106j L10...

Page 9: ...LIPUT PLAYTOWN SIX Foundation Details 600 Concrete 150 Soil 350 Concrete 150 Soil FIG 1 SLIDE CRAWLING TUBE NET TUNNEL CLIMBING NET TRAVERSE WALL ROPE WALK FIREFIGHTERS POLE NET CLIMBER RAMP 800 527 5...

Page 10: ...pg 10 of 27 REF L106 LILLIPUT PLAYTOWN SIX MINIMUM SPACE SURFACE AREA Surfacing Details 11 85m 7 65m...

Page 11: ...ow fundation details 1 L106a L106g L106b L106g L106b L106b L106b L106b L106k L106b L106j L106b L106j L106a L106n L106b L106c L106c L106d L106g L106l L106h L106m L106b RAMP TOWER SLIDE TOWER CLIMBING N...

Page 12: ...ATTERBRIDGE Attach the CLATTERBRIDGE HEX floor to timbers on RAMP AND SLIDE TOWERS and STANDARD HEX FLOOR to NET CLIMBER AND CLIMING WALL timbers Using 4x150mm M12 SQUARE CUP HEX BOLTS 4x Nylocs 4x RE...

Page 13: ...P to the floor METAL FRAME and LEGS Using 2X200mm RAMP PULL TIMBER 2x100mm FIX RAMP TO FLOOR 6X70mm FIX HEX TO RAMP M12 SQUARE CUP HEX BOLTS 10x M12 Nylocs 10x COVERED ENDS Using 2x 5B TORKTAINER 2x N...

Page 14: ...on Instructions ON OTHER TOWER Attach the SLIDE to the HEXBOARD FLOOR Using 3x FM40 Brass Screws 2x FM80 Brass Screws Insert the SLIDE SIDES to the SLIDE and to the timbers L106b L106c USING 4x FM80 B...

Page 15: ...6 LILLIPUT PLAYTOWN SIX Installation Instructions Attach the PANELS x6 to the TIMBERS SHOWN Using 4x FM80 Brass Screws PER PANEL 6 Attach the ROPE to the TIMBER L106f and FLOOR FRAME Using 2x NYLOCS 2...

Page 16: ...G1 FIG3 FIG3 FIG3 FIG2 e e e FIG2 FIG2 ATTACH the CLATTERBRIDGE and TIMBERS L106e Fig1 ATTACH L106e TIMBERS USING 4 X M12 X 200 CUP SQUARE BOLTS 4 X M12 NYLOCS 4 X COVERED ENDS Fig2 ATTACH ROPES USING...

Page 17: ...IX Installation Instructions CRAWLING TUBE ATTACH THE HEXBOARD TO METAL FLOOR FRAME USING 6 X M12 X 75 CUP SQUARE BOLTS 6 X M12 NYLOCS 6 X COVERED ENDS 9 UNDERNEATH PLACE INBWTEEN TOWERS ATTACH UNDERN...

Page 18: ...ENTRANCE RINGS and CENTRE RINGS ATTACH ENTRANCE RINGS USING FM80 BRASS SCREWS ATTACH CENTRE RINGS USING THE PLAYTEC CLIP SETS M12 X 80mm SQUARE CUP BOLTS M12 NYLOCS M12 COVERED ENDS Attach FIRST LAST...

Page 19: ...structions Attach REST of PLAYTEC SLATS and 30X30 BOX SECTION to RINGS USING 0B N1 TORKTAINERS Attach CLIMBING WALL USING FM80 BRASS SCREWS CONTINUE AROUND 12 13 ENSURE THAT EACH SLAT IS AN ALTERNATIV...

Page 20: ...NEL and TIMBER L106i X 2 Fig1 ATTACH 2 X L106i TIMBERS USING 4 X M12 X 200 CUP SQUARE BOLTS 4 X M12 NYLOCS 4 X COVERED ENDS Fig2 ATTACH ROPES USING M12 NYLOCS COVERED ENDS Fig3 ATTACH NET TUNNEL THREA...

Page 21: ...IGHTERS POLE ATTACH TIMBER USING 2 X 200mm CUP SQUARE BOLTS 2 X M12 NYLOCS 2 X COVERED ENDS ATTACH POLE INTO METAL BRACKET TIGHTEN INTO PLACE AND FIX TO MIDDLE OF TIMBER USING FM80 BRASS SCREWS 15 16...

Page 22: ...IN BETWEEN TOWERS Fig1 ATTACH TIMBER 160MM FROM TOP OF UPRIGHTS WITH FM80 WOOD SCREWS Fig2 ATTACH BOTTOM HORIZONTAL ROPES THROUGH UPRIGHTS USING M12 NYLOCS COVERED ENDS Fig3 ATTACH VERTICAL ROPES THR...

Page 23: ...SIX Installation Instructions ATTACH ROPE WALK IN BETWEEN TOWERS Fig1 ATTACH BOTTOM HORIZONTAL ROPES THROUGH UPRIGHTS USING M12 NYLOCS COVERED ENDS Fig2 ATTACH ROPE WALK TO TOWER FLOORS USING M12 NYLO...

Page 24: ...3 X COVERED ENDS Fig5 ATTACH ROPES TO NET CLIMBER GROUND ANCHOR USING 3 X M12 NYLOCS 3 X COVERED ENDS ENSURE NET CLIMBER IS ATTACHED AT THE TOP BEFORE THE GROUND ANCHOR HAS BEEN SECURED INTO ITS FOUN...

Page 25: ...pg 25 of 27 REF L106 LILLIPUT PLAYTOWN SIX Attach the roof Parts NORMAL ROOF Using TORKTAINERS and Brass Screws 20 1 2 a 3 4 5 Installation Instructions...

Page 26: ...pg 26 of 27 REF L106 LILLIPUT PLAYTOWN SIX Attach the roof Parts RUSTIC ROOF Using Brass Screws 20 Installation Instructions 2 3 4 1 QTYx2 Both Sides b...

Page 27: ...pg 27 of 27 REF L106 LILLIPUT PLAYTOWN SIX Additional Dimensions 4 62m 8 45m 2 25m 0 6m...

Reviews: