background image

DOME MOUND TUNNEL

Installation Instructions

REF: CH142 - DOME MOUND TUNNEL

pg 1 of 13

Summary of Contents for DOME MOUND TUNNEL

Page 1: ...DOME MOUND TUNNEL Installation Instructions REF CH142 DOME MOUND TUNNEL pg 1 of 13...

Page 2: ...OME MOUND TUNNEL pg 2 of 13 x4 HEX BOARD FRAMES x11 90x90 TIMBER with HEX SLATS x8 HEX BOARD FRAME SUPPORTS x1 600mm internal diameter MULTIWALL PIPE 4 3m LENGTH SUPPLIED To be cut at an angle ON SITE...

Page 3: ...PARTS required TOOLS required REF CH142 DOME MOUND TUNNEL pg 3 of 13 x44 FM80 BRASS SCREWS x150 25kg bags of BALLAST x12 25kg bags of CEMENT x2 BULK BAGS BALLAST...

Page 4: ...Foundation Details REF CH142 DOME MOUND TUNNEL pg 4 of 13 FOUNDATIONS NOT REQUIRED PLEASE MARK THE AREA DIMENSIONS shown TO FRAME Distances shown EDGE of SURFACING to FRAME FOOT...

Page 5: ...Surfacing Details REF CH142 DOME MOUND TUNNEL pg 5 of 13 MINIMUM SPACE SURFACE AREA The mound...

Page 6: ...1 2 Assembly Instructions REF CH142 DOME MOUND TUNNEL Attach the FRAME SUPPORTS to the FRAMES Repeat to create the 4 FRAMES pg 6 of 13...

Page 7: ...bly Instructions REF CH142 DOME MOUND TUNNEL pg 7 of 13 3 4 Position the MULTIWALL PIPE between the FRAMES The FRAMES slide into the RECESS of the PIPE The distance between the FRAMES will be approx 8...

Page 8: ...kg bags of ballast NOTE THE HATCHED AREA shows APPROXIMATELY how the bags cement and ballast should be mounded Dimensions are taken from GROUND level in the centre to the FRONT EDGE of the FRAME NOTE...

Page 9: ...mbly Instructions REF CH142 DOME MOUND TUNNEL pg 9 of 13 6 7 Attach the ANGLE CLEATS to the outside of the FRAME Using BRASS SCREWS Attach the TIMBER with HEX SLATS to the angle cleats Using BRASS SCR...

Page 10: ...Assembly Instructions REF CH142 DOME MOUND TUNNEL pg 10 of 13 8 9 Repeat for the remaining TIMBERS The TOP cleats are OFFSET Cleat on either FRAME circled red below...

Page 11: ...42 DOME MOUND TUNNEL pg 11 of 13 10 With the timbers attached the PIPE will need to be CUT Dashed RED LINE shows approximate ANGLE REQUIRED NOTE The angle is APPROX 45 degrees NOTE EXCESS Pipe to be c...

Page 12: ...n be surfaced The surfacing will be depend on the individual project MULCH or WETPOUR NOTE The shaded black section shows the layer of SURFACING approx 40mm THE MOUND MUST BE SURFACED this is depend o...

Page 13: ...Additional Drawings REF CH142 DOME MOUND TUNNEL pg 13 of 13...

Reviews: