background image

6

�. First move the X axis to the contact part between the nozzle and the belt (slightly press the nozzle onto the belt ) .    �. Push the two limit switches against the X sliding block to lock 

the limit;    �. Press back on the screen to get the printer back to the origin; adjust the Y axis end-stop adjusting screw according to the position of the nozzle relative to the belt after 

back to the origin in order to make sure the nozzle contacting with the belt rightly; then tighten the Y axis end-stop screw, leveling finished;     �. if there is any seam or over contact 

between the nozzle and the belt, adjust the leveling nut slightly. 

Leveling

The even filament adheres right on the 

platform. 

The nozzle is too close to the platform, 

the  consumables  are  not  extruded 

enough,  and  the  nozzle  outlet  is 

damaged.Causes a plug and scratches 

the belt.

11

4

A

Y axis end-stop adjusting screw

B

Y axis end-stop adjusting the screw

3

A

B

2

1

調平

Y 軸限位安裝螺絲

Y 軸限位調節螺絲

噴嘴離平台太遠,耗材無法黏附在平台上。

噴嘴離平台太近,耗材擠出不足,噴嘴出口
損傷,造成堵塞,刮傷皮帶。

耗材擠出飽滿均勻,剛好貼在平台上。

1. 先把 X 軸移動到噴嘴與皮帶接觸位置 ( 噴嘴微壓皮帶 ) 2. 將兩個限位開關頂著 X 滑動塊鎖緊。 3. 選擇螢幕中的回原點,使得機器自動回原點,根據回原點後噴嘴與
皮帶的相對位置調節 Y 軸限位調節螺絲 ; 使得回原點後噴嘴正好與皮帶接觸,鎖緊 Y 軸限位安裝螺絲,調平完成。 4. 如果發現噴嘴與皮帶有間隙或者接觸過多,可微
調調平螺母調節。

Summary of Contents for 3D Print Mill

Page 1: ...V1 1 3D...

Page 2: ......

Page 3: ...1 3D 3D www cxsw3d com...

Page 4: ...2 1 2 3 4 5 6 7 8 9 10 11 12 10...

Page 5: ...sioning screw 13 Memory card slot and USB socket 9 Y motor 14 Y axis limit adjustment component 10 Material rack and material tube 6 Manual power switch Nozzle kit 2 4 Bed leveling nut Power cable con...

Page 6: ...rinting function Filament sensor Dual z axis screws Z Language switch Computer operating system Print speed 3D Print Mill 200 170mm In nite length 200 170mm length width height FDM 1 0 1mm 0 4mm Stand...

Page 7: ...al pliers x Needle x Cable tie x Wrenches and screwdrivers x Power cable x Pneumatic connector x Blue line claw x Hexagon socket at round head screw M X x Hexagon socket head spring washer combination...

Page 8: ...t round head screw M X x Step Install the pro le support and pro le support to the bottom of machine with four hexagon at head screws M x As shown in the gure above Pro le bracket x Pro le bracket x B...

Page 9: ...t head cap screws with spring washer Hexagon socket head spring washer combination screw M X x Hexagon socket head spring washer combination screw M X x Hexagon socket at round head screw M X x X Y ax...

Page 10: ...3 Install the Spool Holder Spool holder x M T nuts x Hexagon socket at round head screw M X x 8 M5 T M5X8...

Page 11: ...tep Lock the display assembly with two M X at head screws and two M T nuts as shown in the gure above 4 Install the Display Hexagon socket at round head screw M X x M T nuts x 9 M5 T M5X8 2 M5X8 2 M5...

Page 12: ...the cables when the machine is powered on Insert the Te on tube into the pneumatic connector also insert the blue wire clamp Connect the broken detection line as shown in Figure A Connect the power co...

Page 13: ...fter back to the origin in order to make sure the nozzle contacting with the belt rightly then tighten the Y axis end stop screw leveling nished if there is any seam or over contact between the nozzle...

Page 14: ...7 12 UI...

Page 15: ...13 UI...

Page 16: ...8 14...

Page 17: ...ches the target temperature press and hold the spring of the extruder and insert the consumables into the charging detection hole one by one then insert the consumables into the small hole of the extr...

Page 18: ...10 CrealityBelt CrealityBelt Select language close setting add corresponding model printer setting close customize con guration number of prints to complete the setting 16 3 Con guration...

Page 19: ...10 Open the le in turn select the le Insert the memory card press the knob select from the menu the le to be printed 17 G code...

Page 20: ...motor port Z axis motor port E axis motor port Micro USB port Y axis limit screen Controllable nozzle fan X axis limit switch Power input Hot bed wire port Heating pipe interface Broken material detec...

Page 21: ...19...

Page 22: ...USB 1 USB 2 USB 3 USB 1 2 1 2 1 2 1 2 1 2 1 2 E E 20...

Page 23: ......

Page 24: ...11F Room 1201 Block 3 JinChengYuan Tongsheng Community Dalang Longhua District Shenzhen China 518109 Official Website www creality com Tel 86 755 8523 4565 E mail info creality com cs creality com...

Reviews: