background image

 
 

 
 
 
 
INTRODUCTION 
A semi positive displacement nutantic disc flow transducer type 
KDN is situated in the liquid line, which detects the transfer of 
very  small  volumes  of  liquid.  A  magnetically  operated  switch 
converts  the  disc  movement  into  pulses  which  are  transferred 
along twin screened wire to remote electronic counting/control 
devices. 
 
INSTALLATION 

Location of Meter. 
It  is  recommended  that  the  meter  be  fitted  into  a  horizontal 
section of the pipe run wherever possible. With the meter fitted 
into vertical pipe, errors  in  registration can be  possibly  caused 
by the settling of the disc due to  gravity  within the measuring 
chamber after shut of the movement of the disc after metering 
has ceased can trigger the reed switch and create an extra pulse. 
The meter should be fitted upstream of any flow control device, 
thus preventing free discharge from the meter and reducing the 
risk of draining and vopour locking causing erroneous reading 
on start up. 
 

Preparation of  Pipework

 

Before Petting the meter into position, the following points 
should be checked: 

 

That unions or flanges of correct size and spacification have 
been fitted to the pipeline in the required position. Joints 
requiring the application of heat must never be made with 
the meter in position. 

 

That the distance between unions or flanges is correct for the 
meter to be fitted. 

 

That the two unions or flanges are in line, and all local 
pipework is unstrained and correctly supported. This is 
particulary significant when using meters constructed in 
PVC. 

 

The pipeline must be purged of a!! rust, swarf welding slag 
jointing compound by flushing or similar means before 
putting the meter into service. 

 

 

 

 

Summary of Contents for KDN

Page 1: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL OF METERS KDN ...

Page 2: ...d create an extra pulse The meter should be fitted upstream of any flow control device thus preventing free discharge from the meter and reducing the risk of draining and vopour locking causing erroneous reading on start up Preparation of Pipework Before Petting the meter into position the following points should be checked That unions or flanges of correct size and spacification have been fitted ...

Page 3: ...amage to the meter internals may result Electrical Connections Electrical connections between the meter and the indicating of control instrument shall be made using screened cable The reed switch is protected in a inox case The switch withstand temperature up 100 C and is completely waterproofed The maximum recommended lenght of cable is 100 metres contatt type N O VA max 10 A max 0 2 V max 30 T m...

Page 4: ... Some resistance will be felt when removing the plate as an O ring seal is located on the end plate spigot Remove the disc chamber Remove disc by gently lifting from the chamber Remove barrier plate Having completely dismantled meter all component may be thoroughly washed in warm soapy water On no account should abrasive materials be used to clean the meter parts as meter accuracy relies upon the ...

Page 5: ...o particles are embedded in the disc wall Replace the piston into chamber feeding the can slot over the barrier plate and check that for all positions of the piston within the chamber the amount of side play or free movement is not excessive and that the piston rotates within the chamber To check that small meters are operating correctly after assembly place meter to lips and blow into the connect...

Page 6: ...118 175 20 82 5 5 KDN 0 1 148 197 34 103 9 5 KDN 0 1 W 176 248 37 125 14 KDN 0 2 242 320 40 130 23 KDN 0 3 300 375 62 162 52 MODEL FLOW RATE PULSES MSI 316 Min Mai Uh cc x imp T ma C P ma bar KDN 1 200 6 000 135 80 10 KDN 1 900 12 000 220 80 10 KDN 2 2 000 22 000 500 80 10 ...

Page 7: ...Pag 5 The number of omitted pulses is the and it refers to water DISCS MATERIALS PTFE MSI 316 O R MATERIALS VITON FIFE EPDM NTIRILE EXPLODED VIEW OF METER PARTS KDN 3 3 500 35 000 780 80 10 ...

Page 8: ...Pag 6 ...

Page 9: ... do not exitate to contact our Technical Department in CRAIND IMPIANTI Valves Remotely controlled valves when fitted should be of the fast closing type to minimize the effect of over run at the end of a batch delivery Generally pneumatically operated valves are recommended Our Technical Department in CRAIND IMPIANTI will be pleased to offer a suitably specified valve to suit your requirements Pag ...

Page 10: ...e adhered to Liquid detergent temperatures in excess of the maximum stated in the meter specification should not be used for cleaning purposes or distortion and expansion of the disc will result causing the piston to bind within the chamber Check that cleaning fluid will not attack or corrode the material of the meter Sterilization with steam is not admitted If it is necessary the pressure of the ...

Page 11: ...and see whether or not pulses are received on the control equipment at the other end of signal cable If pulses are not received then there is a break somewhere in the interconnection cable and it should be replaced If pulses are received re connect the cable Check the operation of the reed switch by Remove the head assembly from the meter and connect a battery ohm meter Pass a normal magnet across...

Page 12: ...assing of unmetered fluid 2 Resistance to motion of the disc due to Particles of foreign matter embedded in the working surfaces of the meter A gummed up meter due to ineffective temperature control or settling out during shut off A distorted disc due to operation at temperatures in excess of the maximum permitted Worn barrier or roller allowing the disc to cock during operation are not in the rig...

Page 13: ...rmations completate the istruction s manual and the standard s service 1 What operating features have Your equipment 2 1 1 Marking and esplications All of Yours equipment have this label Pag 11 ATEX ADDICT ISTRUCTIONS AND IN FORMATION ...

Page 14: ...ON The observance of the instruction contained in this chapter can be produce severe damages to the people or it can be cause the death This instructions don t prescind from an appropriate utilization of the equipment and from the istructions on the generic instruction s manual Pag 12 ...

Page 15: ...te 1 refer to the individual instructions for the other accessory united to the meter Note 2 all meters must be assembled with this follow addict precaution Pag 13 ATEX ADDICT ISTRUCTIONS AND IN FORMATION ...

Page 16: ...REPLACEMENT REED KDN OLD SERIES NEW SERIES Pag 14 ...

Reviews: