20
SHED ASSEMBLY – ROOF
Before proceeding, locate and identify channels on
interior side of right roof (O) and left roof (Q). Locate
three underside tabs contained within each channel.
Before proceeding, locate and identify the six front
header tabs and six rear header tabs.
2
3
1
25
FF
FF
GG
O
BB
x8
Place skylight gasket (GG) into skylight (FF). Place sky-
light (FF) onto right roof panel (O). Secure from under-
side with eight screws
(BB)
. Make sure rib on roof panel
is seated fully against gasket on skylight.
Lay right roof (O) directly over three tabs on right side
of front header (K) and three tabs on right side of rear
header (L). With right roof slots seated over/on header
tabs, check alignment in all six spots.
1
U
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
O
1
26
Summary of Contents for 65018
Page 48: ...48 ...