11
Place the PE bag (#23) into the drum (#48)
and place the inner frame inside the PE bag
in order to press the bag down.
Figure-12 Placing the bag inside the drum
with the inner frame
Pull down the quick lever and thread the nut
(#41) onto the quick lever thread and
tighten it. This will secure the drum lid to the
cone.
CYCLONE BAG FRAME
ASSEMBLY
Attach each long side support rod (#2) and
short side support rod (#5) to the ring (#1)
using bolts (#3) and nuts (#4) provided.
Now position the second ring (#1) around
the long side and short side support rods
and secure it using bolts (#3) and nuts (#4)
provided. See figure-13.
Figure-13 Assembling the cyclone bag
frame
ON/OFF SWITCH
The CX413 features a magnetic ON/OFF
switch with a large Emergency Stop/Reset
button located on the left side of the inlet.
Figure-14 ON/OFF Switch with removable
key